⚡ 195 JACKSON LN

Pittsylvania, VA — Intake Report
📍 36.8495961, -79.3851103 📐 7.01 acres 🏷️ APN: 2427-30-9081 🔌 2b8a1783-f6da-4d1e-bae4-9ed490f4fa58 📅 Generated May 12, 2026 12:34 PM 🆔 VA002317
Go
BESS Score: /10 Buildable: ac Nearest Sub: Chatham (400 ft) Zoning: Residential - Single Family Residential
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

CLARK, JUANITA W
7.01
2427-30-9081
Residential - Single Family Residential (R-1)
Battery Energy Storage
Pittsylvania
51143
HWY 976 4.94 AC

⚡ Infrastructure

2b8a1783-f6da-4d1e-bae4-9ed490f4fa58
34.5 kV
Chatham
400 ft
115 kV kV
115kV at 0.1 mi (VIRGINIA ELECTRIC & POWER CO)
Public
POI requires extension in public ROW
Good

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
2 site(s) within ~2 mi

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Pittsylvania County
County
Loading from layers...

📊 Assessment

Go
/10

🤖 AI Site Assessment — Gemini Deep Research

Site Diligence Analysis: 195 JACKSON LN, Pittsylvania County, VA

Sunland America Corp. has tasked me with a comprehensive site diligence analysis for the property located at 195 JACKSON LN in Pittsylvania County, VA. This analysis evaluates the site's suitability for a distribution-scale (≤5MW) or utility-scale Battery Energy Storage System (BESS) project, considering various technical, environmental, regulatory, and financial factors.

1. Site Access & Topography

  • Road Access Quality and Equipment Delivery Feasibility: The property benefits from "Public" road access, which is a significant advantage for equipment delivery and ongoing operations. This suggests well-maintained roads capable of handling heavy vehicle traffic. The "POI requires extension in public ROW" indicates that while the site itself has good access, the specific point of interconnection will necessitate some off-site infrastructure work within the public right-of-way. This could involve trenching and conduit installation, requiring coordination with the county and potentially the utility.
  • Likely Terrain Characteristics: The "Buildability: Good" assessment is a strong positive indicator, suggesting the terrain is relatively flat, stable, and requires minimal grading or complex earthwork. For a 7.01-acre parcel, this implies efficient site layout and construction.
  • Heavy Equipment Access: Given public road access and good buildability, heavy equipment such as transformers, battery containers, and construction machinery should be able to access the site without significant challenges. The primary consideration will be the route for the POI extension, ensuring it can accommodate trenching equipment and material delivery.
  • Access Easement Concerns: The need for a "POI extension in public ROW" will require careful planning regarding utility easements or encroachment permits from Pittsylvania County. While it's within the public right-of-way, the specific path and necessary permits for utility infrastructure installation must be secured. This is a common requirement but needs to be factored into the project timeline and cost.

2. Environmental Constraints

  • FEMA Flood Zone Designation: The FEMA Flood Zone designation is currently Unknown. This is a critical data gap. A BESS project cannot proceed without understanding flood risk. If the site is within a 100-year floodplain (AE or VE zones), significant engineering and permitting challenges, including elevated foundations and stringent floodproofing measures, would be required, substantially increasing costs and potentially rendering the site unfeasible. Requires immediate verification.
  • Wetlands Presence and Setback Requirements: Wetlands presence is also Unknown. This is another critical environmental unknown. The presence of jurisdictional wetlands would trigger federal (US Army Corps of Engineers) and state (Virginia Department of Environmental Quality) permitting, requiring extensive delineation, mitigation planning, and potential avoidance setbacks, which could reduce the usable acreage and significantly delay the project. Requires immediate verification via a wetland delineation study.
  • Critical Habitat / Endangered Species Risk: The data indicates "Critical Habitat: None" and "Protected Areas: None." This is a positive finding, suggesting a lower risk of encountering endangered species or their habitats, which can otherwise lead to extensive environmental review and mitigation requirements.
  • Brownfield/Superfund Status: The data notes "2 site(s) within ~2 mi" for Brownfield/Superfund. While the immediate parcel is not identified as a brownfield, the proximity to such sites raises a flag for potential off-site contamination migration or historical land use issues that could impact the site. For the IRA brownfield bonus, the *specific project site* must qualify as a brownfield. This site does not currently qualify for the bonus based on the provided data. A Phase I Environmental Site Assessment (ESA) is crucial to assess any on-site contamination risk, regardless of brownfield bonus eligibility.
  • Chesapeake Bay Critical Area Implications: The data confirms "Chesapeake Critical Area: N/A (non-MD)." This is expected as the site is in Virginia, and therefore, specific Maryland critical area regulations do not apply.
  • Pipeline Proximity Safety Considerations: The data states "Pipeline Proximity: None within ~3 miles" and "Gas Wells Nearby: None within ~2 miles." This is a significant positive for safety, as proximity to high-pressure gas pipelines or wells can introduce substantial safety setbacks, risk assessments, and complex permitting requirements.

3. Grid Infrastructure & Interconnection

  • Nearest Substation: The Chatham substation is an excellent 400 ft away, with a Max Voltage of 115 kV. This extremely close proximity is a major advantage, minimizing the length and cost of the generation tie-line.
  • Nearest Transmission Line: A 115kV transmission line is located at 0.1 mi (approximately 528 ft) and owned by VIRGINIA ELECTRIC & POWER CO (likely Dominion Energy). This proximity further reinforces the strong grid access.
  • Recommended Interconnection Voltage: The specified "IX Voltage: 34.5 kV" strongly indicates a distribution-level interconnection. Given the project's likely scale (≤5MW), connecting at 34.5 kV to a distribution feeder emanating from the nearby Chatham substation is the most logical and cost-effective approach. While a 115kV transmission line is close, transmission interconnection is typically reserved for larger utility-scale projects and involves higher costs and more complex studies.
  • Estimated Interconnection Cost Range and Timeline: The physical interconnection costs for the generation tie-line will be relatively low due to the minimal distance (400 ft) to the substation. However, the primary cost and timeline drivers will be the utility's interconnection study process (Feasibility, System Impact, Facilities studies) and queue position. For a distribution-level project in Virginia, typical study timelines can range from 12-24 months, with total project development (including construction) potentially extending to 3-5 years. Costs for utility upgrades, if required, are highly variable but could range from $500,000 to several million dollars depending on available feeder capacity and substation constraints.
  • Utility-Specific IX Process and Typical Queue Times: The "Interconnecting Utility" is provided as a UUID (2b8a1783-f6da-4d1e-bae4-9ed490f4fa58), which needs to be resolved to a specific utility name. Given the location in Virginia, it is highly probable this refers to Dominion Energy. Dominion Energy has a well-defined interconnection process, but queue times can be substantial due to high demand for renewable and storage projects. Understanding their specific queue and current study backlogs is critical. Requires immediate identification of the utility.
  • Likely Feeder Configuration: Proximity to a 115kV substation suggests the presence of robust distribution feeders. The 34.5 kV IX voltage indicates a connection to a primary distribution feeder. The exact configuration (e.g., radial, looped, number of customers) is unknown but will be determined during the interconnection studies.

4. Regulatory & Zoning Analysis

  • Authority Having Jurisdiction (AHJ) and its Type: The AHJ is "Unincorporated (county jurisdiction)," meaning Pittsylvania County, VA, is the primary regulatory body for zoning, land use, and permitting.
  • Current Zoning for BESS Compatibility: The current zoning is "R-1 (Residential - Single Family Residential)." This is a major red flag. BESS facilities are typically classified as industrial, commercial, or utility uses, which are generally incompatible with single-family residential zoning.
  • Recommended Permitting Pathway: Given the R-1 zoning, a "by-right" permitting pathway is highly improbable. The most likely pathways would be:
    • Conditional Use Permit (CUP) or Special Use Permit (SUP): This would require demonstrating that the BESS project meets specific conditions and criteria to be allowed in an R-1 zone, often involving extensive public hearings, neighborhood outreach, and strict operational conditions (e.g., noise, visual screening, safety plans). This is a challenging pathway in residential zones.
    • Rezoning: A full rezoning from R-1 to an industrial or commercial classification would be a lengthy, expensive, and politically challenging process, especially if there is local opposition.
    • Variance: A variance is typically granted for minor deviations from zoning requirements due to unique property hardships, not for a fundamental change in land use. It is highly unlikely a variance would be granted for a BESS in an R-1 zone.

    The R-1 zoning presents a significant hurdle that could render the site unfeasible without substantial community and political support.

  • Known Setback Requirements: Specific setback requirements for BESS in Pittsylvania County are Unknown. However, given the R-1 residential zoning, it is highly probable that the county would impose significant setbacks from property lines, adjacent residential structures, and public roads to mitigate noise, visual, and safety concerns. These could severely limit the usable area on the 7.01-acre parcel. Requires immediate investigation of county ordinances.
  • Reference Specific State/County Regulations: Virginia has state-level guidance for BESS, but local zoning ordinances are paramount. Pittsylvania County's Zoning Ordinance (Chapter 30, Article IV for R-1 districts) would need to be thoroughly reviewed to determine if BESS is listed as a permitted, conditional, or prohibited use.
  • Moratorium or Restriction Risks: While no specific moratorium is noted, the R-1 zoning itself acts as a de facto restriction. There is a high risk of local opposition from residents, which could lead to project delays, increased costs, or outright denial of permits.

5. IRA/ITC Incentive Analysis

  • Opportunity Zone Eligibility: The site is designated "Opportunity Zone: No." This means the project will not qualify for the additional 10% Investment Tax Credit (ITC) adder associated with Opportunity Zones.
  • Energy Community Status: The site is designated "Energy Community: No." This means the project will not qualify for the additional 10% ITC adder for Energy Communities.
  • Low-Income Community Qualification: The site is designated "Low-Income Community: No." This means the project will not qualify for the additional 10% or 20% ITC adder for Low-Income Communities.
  • Calculate Potential Cumulative ITC Adder Percentage: Based on the provided data, the potential cumulative ITC adder percentage for this site is 0%. This significantly impacts the project's financial viability, as it will only be eligible for the base 30% ITC (assuming prevailing wage and apprenticeship requirements are met), without any of the valuable adders.

6. BESS Score & Rationale

BESS Suitability Score: 35/100

  • Location (0-20): 15
    • Rationale: Excellent public road

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.