Southampton, VA — Intake Report
📍 36.6571799, -76.9819125 📐 64.39 acres 🏷️ APN: 92-9 🔌 📅 Generated May 12, 2026 12:05 PM 🆔 VA001025
No-Go
BESS Score: 81/10 Buildable: 22.23 ac Nearest Sub: Watkins Corner (0.038 miles) Zoning: Vacant Land - Vacant Land (General)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

JORDAN INVESTMENTS LLC -
64.39
92-9
Vacant Land - Vacant Land (General) (A-1)
Battery Energy Storage
Southampton
51175
BLK 19 TR # 109

⚡ Infrastructure

Watkins Corner
0.038 miles
115 kV kV
230kV at 0.1 mi (VIRGINIA ELECTRIC & POWER CO)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
None within ~2 miles

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Southampton
County
Loading from layers...

📊 Assessment

No-Go
No-Go
81/10

🤖 AI Site Assessment — Gemini Deep Research

Site Diligence Analysis: Southampton County, VA (APN: 92-9)

As a senior BESS site evaluation analyst for Sunland America Corp, I have performed a comprehensive diligence analysis for the property located in Southampton County, VA, APN: 92-9. This analysis focuses on distribution-scale (≤5MW) and utility-scale BESS project suitability.

1. Site Access & Topography

  • Road Access Quality and Equipment Delivery Feasibility: The provided data states "Road Access: Unknown" and "POI Access: Unknown." This is a critical information gap. Southampton County is generally rural, suggesting that access roads may be unpaved or of lower quality. For heavy equipment such as transformers, battery containers, and construction machinery, robust access roads are essential. If existing roads are inadequate, significant investment in road upgrades, widening, and reinforcement will be required. This necessitates an immediate physical site visit to assess current road conditions and identify potential access points.
  • Likely Terrain Characteristics: The property is 64.39 acres of "Vacant Land" in Southampton County, VA. This region typically features flat to gently rolling terrain, which is generally favorable for BESS development. However, the "Buildable Acres: 22.23" out of 64.39 suggests that a significant portion (approximately 65%) may be unbuildable due to factors such as wetlands, steep slopes (less likely in this region), or other environmental constraints. A detailed topographic survey will be necessary to confirm buildable areas and identify any grading requirements.
  • Heavy Equipment Access: Assuming adequate road access can be established or upgraded, the relatively flat terrain should not inherently prevent heavy equipment access to the buildable areas. However, the unknown quality of existing roads and potential internal site access routes (POI Access) remains a primary concern.
  • Access Easement Concerns: With "Road Access: Unknown," it is unclear if the property has direct public road frontage. If not, securing access easements from neighboring parcels will be a critical and potentially time-consuming and costly undertaking. This must be verified during the initial site visit.

2. Environmental Constraints

  • FEMA Flood Zone Designation: The FEMA Flood Zone is "Unknown." This is a significant risk. BESS components are sensitive to water, and siting within a floodway is generally prohibited. Siting within a 100-year floodplain (AE or A zones) would necessitate elevated equipment, flood-resistant construction, and potentially costly flood mitigation measures, significantly impacting project cost and design. Immediate investigation to obtain official FEMA flood maps is required.
  • Wetlands Presence and Setback Requirements: Wetlands are also "Unknown." Given the substantial difference between total acres (64.39) and buildable acres (22.23), the presence of wetlands is highly suspected. Wetlands require significant setbacks (often 50-100 feet or more depending on jurisdiction and wetland type) and can trigger complex and lengthy permitting processes (e.g., US Army Corps of Engineers Section 404 permits, state-level permits). A professional wetland delineation is a high-priority next step.
  • Critical Habitat / Endangered Species Risk: The data indicates "Critical Habitat: None." This is a positive finding, reducing environmental permitting complexity and risk of project delays associated with protected species.
  • Brownfield/Superfund Status: The property is "None within ~2 miles" of a Brownfield/Superfund site. While this is positive for environmental risk mitigation, it means the project will not qualify for the IRA Brownfield ITC bonus adder, which could have provided an additional 10% ITC.
  • Chesapeake Bay Critical Area Implications: The data confirms "Chesapeake Critical Area: N/A (non-MD)." This is beneficial as it avoids the stringent environmental regulations and development restrictions associated with the Chesapeake Bay Critical Area in Maryland.
  • Pipeline Proximity Safety Considerations: "Pipeline Proximity: None within ~3 miles" is an excellent finding. This eliminates safety setbacks, potential explosion risks, and complex coordination requirements often associated with siting near high-pressure gas or hazardous liquid pipelines.

3. Grid Infrastructure & Interconnection

  • Nearest Substation: The Watkins Corner substation is exceptionally close at 0.038 miles, with a maximum voltage of 115 kV. This proximity is a major advantage, significantly reducing the cost and complexity of the generation tie-line.
  • Nearest Transmission Line: A 230kV transmission line is also very close, at 0.1 miles, owned by VIRGINIA ELECTRIC & POWER CO (likely Dominion Energy). This offers flexibility for higher voltage interconnection if the project scales beyond 5MW.
  • Recommended Interconnection Voltage: For a distribution-scale project (≤5MW), interconnection at 115kV to the Watkins Corner substation is the most logical and cost-effective approach. While 230kV is available, the associated equipment and interconnection costs would likely be disproportionately high for a smaller project.
  • Estimated Interconnection Cost Range and Timeline: Given the extremely short tie-line distance (less than 0.1 miles), the direct construction costs for the gen-tie will be minimal. However, the primary cost and timeline drivers will be substation upgrades (if required) and the utility's interconnection queue. Without knowing the available capacity at Watkins Corner 115kV, it's difficult to estimate. Assuming minimal substation upgrades, costs could range from $500k - $1.5M. Timelines for Dominion Energy's interconnection process can be 18-36 months, even for smaller projects, due to queue backlogs and study requirements.
  • Utility-Specific IX Process and Typical Queue Times: The interconnecting utility is "Unknown," but given the location and transmission line owner, it is almost certainly Dominion Energy. Dominion Energy has a structured but often lengthy interconnection process involving feasibility, system impact, and facilities studies. Queue times are a significant factor in Virginia, and early engagement is crucial.
  • Likely Feeder Configuration: For a 115kV interconnection, the project would likely connect directly to a 115kV bus at the Watkins Corner substation or a dedicated 115kV sub-transmission line emanating from it. This is a robust connection point.

4. Regulatory & Zoning Analysis

  • Authority Having Jurisdiction (AHJ): The AHJ is "Unincorporated (county jurisdiction)," meaning Southampton County is

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.