OLD MCDONALD FARM -
84.49
230-011-00-00-0024-04
Residential - Single Family Residential (-)
Battery Energy Storage
Washington
42125
LOT 1R 81.9 AC @ C&G & 4 AC INEL HSE 2 STY FR/GAR/OTHER STRUCTURES & OTHER STRUCTURES

⚡ Infrastructure

West Penn
Claysville
0.098 miles
138 kV kV
138kV at 0.2 mi (WEST PENN POWER COMPANY)
Public
POI Onsite
OK

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
None within ~2 miles

💰 IRA/ITC Adders

No
Yes — Coal Closure
No

🏛️ Jurisdiction

Donegal
Township
Loading from layers...

📊 Assessment

Go
84/10

🔍 Site Diligence Checklist

Complete these items directly. Changes are saved automatically.

AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🤖 AI Site Assessment — Gemini Deep Research

Site Diligence Analysis for 1057 STATE ROUTE 40 W, Washington County, PA

As a senior BESS site evaluation analyst for Sunland America Corp, I have performed a comprehensive diligence analysis for the property located at 1057 STATE ROUTE 40 W, Washington County, PA. This analysis evaluates the site's suitability for distribution-scale (≤5MW) and utility-scale BESS projects, focusing on critical development factors.

1. Site Access & Topography

  • Road Access Quality and Equipment Delivery Feasibility: The property benefits from "Public" road access via STATE ROUTE 40 W. US Route 40 is a significant highway, suggesting excellent road quality capable of handling heavy vehicle traffic. This is a substantial advantage for the delivery of oversized equipment such as transformers, battery containers, and construction materials. The "POI Onsite" designation further indicates direct access to the Point of Interconnection, minimizing the need for off-site infrastructure development for grid access.
  • Likely Terrain Characteristics: The property has 84.49 total acres with "Buildable Acres: 21.36" and a "Buildability: OK" rating. This suggests that while a significant portion of the land may have slopes or other constraints, there is a substantial area suitable for development. Washington County, PA, is characterized by rolling hills and valleys, so some grading and earthwork should be anticipated, but the "OK" buildability and available buildable acres indicate that a suitable pad can be established for a BESS.
  • Heavy Equipment Access: Given the public access via STATE ROUTE 40 W and the "POI Onsite" status, heavy equipment access for transformers, battery containers, and other large components is highly feasible. The primary concern would be the internal site roads and laydown areas, which would need to be designed to accommodate these loads.
  • Access Easement Concerns: No specific access easement concerns are noted in the provided data. However, a detailed ALTA survey and title review would be essential to confirm property boundaries, existing easements (e.g., utility, ingress/egress), and ensure unencumbered access to the buildable area and POI.

2. Environmental Constraints

  • FEMA Flood Zone Designation: The FEMA Flood Zone is currently "Unknown." This is a critical data gap. BESS facilities must be sited outside of floodways and typically outside of 100-year floodplains (Zone AE/A) or require significant flood mitigation measures (e.g., elevated platforms), which add substantial cost and complexity. Requires Verification.
  • Wetlands Presence and Setback Requirements: Wetlands presence is also "Unknown." This is another significant environmental constraint. If wetlands are present, delineation, permitting (e.g., Section 404/401 permits from USACE/PADEP), and potential mitigation could be required, leading to project delays, increased costs, and reduced developable area due to setback requirements. Requires Verification.
  • Critical Habitat / Endangered Species Risk: The data indicates "Critical Habitat: None." This is a positive finding, reducing the risk of delays or project modifications due to endangered species protection.
  • Brownfield/Superfund Status: The property is "None within ~2 miles" of any Brownfield/Superfund sites. This means there is no risk of contamination requiring remediation, but also no eligibility for the IRA Brownfield bonus ITC adder.
  • Chesapeake Bay Critical Area Implications: The data confirms "Chesapeake Critical Area: N/A (non-MD)," so this constraint is not applicable to the Pennsylvania site.
  • Pipeline Proximity Safety Considerations: The data states "Pipeline Proximity: None within ~3 miles" and "Gas Wells Nearby: None within ~2 miles." This is a significant advantage, as it eliminates potential safety setbacks, permitting complexities, and land use conflicts associated with high-pressure pipelines or active gas operations.

3. Grid Infrastructure & Interconnection

  • Nearest Substation & Transmission Line: The nearest substation, Claysville, is exceptionally close at 0.098 miles, with a Max Voltage of 138 kV. A 138kV transmission line is also in very close proximity at 0.2 miles (WEST PENN POWER COMPANY). This is an outstanding advantage for grid access.
  • Likely Interconnection Voltage: Given the project's focus on distribution-scale (≤5MW) and utility-scale, and the immediate proximity to a 138kV substation and transmission line, the likely interconnection voltage for a utility-scale project would be 138kV. For a distribution-scale (≤5MW) project, interconnection would typically occur at a lower distribution voltage (e.g., 12kV, 25kV, 34.5kV) via a step-down transformer at the substation or a nearby feeder. However, the 138kV proximity offers excellent optionality for future expansion or larger projects.
  • Estimated Interconnection Cost Range and Timeline: The extremely short distance to both the substation and transmission line suggests significantly lower interconnection costs compared to sites requiring extensive new line construction. Costs would primarily involve substation upgrades (if needed), protection and control equipment, and a short gen-tie line. Timelines are still subject to West Penn's specific interconnection queue and study processes, but the physical proximity should expedite engineering and construction phases. A preliminary estimate for a 5MW project could range from $500,000 to $2 million, with a timeline of 18-36 months for studies and construction, depending on utility queue congestion and required upgrades.
  • Utility-Specific IX Process and Typical Queue Times: The interconnecting utility is West Penn Power. West Penn (an Evergy company) follows FERC Order 2003/2222 for transmission-level interconnections and state-specific rules for distribution-level. Their queue times can vary, but like most utilities, they face increasing demand. Early engagement and a robust application are crucial. Requires Verification of current West Penn queue status and typical study durations.
  • Likely Feeder Configuration: The "POI Onsite" suggests direct access to the grid. For a distribution-scale project, it would likely be a direct tap into a distribution feeder from the Claysville substation. For a larger project, a direct connection to the 138kV bus at the substation is probable. The specific feeder configuration (e.g., radial, networked) and available capacity would be determined through West Penn's system impact and facility studies.

4. Regulatory & Zoning Analysis

  • Authority Having Jurisdiction (AHJ) and its Type: The AHJ is listed as "Found (unnamed) Municipality / AHJ" within Washington County, PA. It is critical to immediately identify the specific municipality (e.g., township, borough) that governs this address, as local zoning and permitting ordinances will be paramount.
  • Current Zoning for BESS Compatibility: The current zoning is "Residential - Single Family Residential (Code: -)." This is a major red flag. BESS facilities are typically classified as industrial, utility, or commercial uses and are generally incompatible with residential zoning.
  • Recommended Permitting Pathway: Given the residential zoning, a "by-right" permitting pathway is highly improbable. The most likely pathways would involve:
    • Conditional Use Permit (CUP) or Special Exception (SUP): This would require demonstrating that the BESS meets specific conditions and criteria outlined in the local ordinance, often involving public hearings and discretionary approval.
    • Zoning Variance: This is typically sought for minor deviations from zoning requirements and is less likely for a fundamental use incompatibility.
    • Rezoning: A full rezoning of the parcel from Residential to an Industrial or Commercial designation would be the most robust solution but is a lengthy, politically sensitive, and uncertain process requiring comprehensive plan amendments and public support.
    The residential zoning presents

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.