⚡ 2144 W SUNBURY RD

Butler, PA — Intake Report
📍 41.0956408, -79.8935195 📐 17.34 acres 🏷️ APN: 070-2F49-A4-0000 🔌 West Penn 📅 Generated May 12, 2026 11:51 AM 🆔 PA003547
Go
BESS Score: 71/10 Buildable: 10.74 ac Nearest Sub: BOYERS (0.08 miles) Zoning: Residential - Rural/Agricultural Residence
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

CAROL BARTLEY
17.34
070-2F49-A4-0000
Residential - Rural/Agricultural Residence (-)
Battery Energy Storage
Butler
42019
17.62 ACS HSE GAR

⚡ Infrastructure

West Penn
BOYERS
0.08 miles
- kV
None within ~3 miles
Public
POI Onsite
Good

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
None within ~2 miles

💰 IRA/ITC Adders

No
Yes — Coal Closure
No

🏛️ Jurisdiction

Cherry
Township
Loading from layers...

📊 Assessment

Go
71/10

🤖 AI Site Assessment — Gemini Deep Research

Site Diligence Analysis: 2144 W SUNBURY RD, Butler, PA

As a senior BESS site evaluation analyst for Sunland America Corp, I have performed a comprehensive diligence analysis for the property located at 2144 W SUNBURY RD in Butler, PA. This analysis focuses on distribution-scale (≤5MW) and utility-scale BESS project suitability, leveraging the provided property data.

1. Site Access & Topography

  • Road Access Quality and Equipment Delivery Feasibility: The property benefits from Public Road Access, which is a significant advantage for logistics. This indicates that the site is likely accessible via a paved or well-maintained public road, facilitating the transport of personnel, materials, and heavy equipment. The notation "POI Onsite" further suggests that the Point of Interconnection is located directly on the property, eliminating the need for off-site line extensions or complex access easements for utility infrastructure.
  • Likely Terrain Characteristics: With 17.34 total acres and 10.74 buildable acres, coupled with a "Good" buildability rating, the terrain is likely to be relatively flat or gently sloping. The "Residential - Rural/Agricultural Residence" zoning often implies undeveloped or agricultural land, which typically presents fewer topographical challenges than heavily forested or mountainous regions. This suggests minimal earthwork requirements for site preparation.
  • Heavy Equipment Access: Given the public road access and good buildability, heavy equipment such as cranes, flatbed trucks for transformer delivery, and specialized vehicles for battery container transport should be able to access the site without significant difficulty. The internal site layout would need to be designed to accommodate turning radii and load-bearing requirements for these vehicles.
  • Access Easement Concerns: The "POI Onsite" status is highly favorable, as it minimizes the need for off-site utility easements that can be complex and time-consuming to secure. While general access easements for the public road are inherent, no specific private access easement concerns are immediately apparent from the data. However, a detailed title search would be required to confirm any encumbrances.

2. Environmental Constraints

  • FEMA Flood Zone Designation: The FEMA Flood Zone is currently Unknown. This is a critical data gap. A detailed flood plain analysis is immediately required. If the site falls within a 100-year (Zone AE, A) or 500-year (Zone X-500) flood zone, it could necessitate elevated equipment pads, specialized flood-resistant designs, increased foundation costs, and more stringent permitting requirements, potentially impacting project economics and timeline.
  • Wetlands Presence and Setback Requirements: Wetlands presence is also Unknown. This is another critical gap. Wetlands identification and delineation are essential. If wetlands are present, federal (USACE Section 404) and state (PA DEP Chapter 105) permits would be required, leading to potential permitting delays, mitigation costs, and significant setback requirements that could reduce the effective buildable area.
  • Critical Habitat / Endangered Species Risk: The data indicates None for Critical Habitat. This is a positive finding, as it significantly reduces the risk of encountering federal or state endangered species act compliance issues, which can cause substantial project delays and costs.
  • Brownfield/Superfund Status: The property is noted as having None within ~2 miles for Brownfield/Superfund sites. This is favorable, as it avoids the risks and costs associated with environmental remediation. While it means the project would not qualify for the IRA Brownfield bonus, it also eliminates the liabilities of developing on contaminated land.
  • Chesapeake Bay Critical Area Implications: The data correctly states N/A (non-MD), as Butler County, PA, is not within the Chesapeake Bay Critical Area. Therefore, no specific regulations related to this designation apply.
  • Pipeline Proximity Safety Considerations: There are None within ~3 miles for pipeline proximity. This is a significant safety advantage, as it eliminates the need for extensive pipeline setback analyses, emergency response planning coordination with pipeline operators, and potential land use restrictions that can arise from developing near high-pressure gas or hazardous liquid pipelines. Similarly, No Gas Wells Nearby within ~2 miles further enhances site safety and reduces potential land use conflicts.

3. Grid Infrastructure & Interconnection

  • Nearest Substation: The nearest substation, BOYERS, is an exceptional 0.08 miles away. This extremely close proximity is a major advantage, significantly reducing the cost and complexity of the interconnection line extension. However, the Max Voltage is Unknown, which is a critical piece of information. This needs immediate verification to understand the substation's capacity and voltage class.
  • Nearest Transmission Line: The absence of a transmission line within ~3 miles suggests that a direct transmission-level interconnection is unlikely or impractical for a distribution-scale project.
  • Recommended Likely Interconnection Voltage: Given the project's target size (≤5MW) and the proximity to a substation without nearby transmission, the likely interconnection will be at the distribution voltage level. Common distribution voltages in this region could be 12.47 kV, 25 kV, or 34.5 kV. The specific voltage will depend on the available feeders at the BOYERS substation.
  • Estimated Interconnection Cost Range and Timeline: The extremely short distance to the substation (0.08 miles) suggests a lower-end interconnection cost, potentially ranging from $500,000 to $1,500,000 for a distribution-scale project, assuming minimal substation upgrades are required. However, this is highly dependent on the substation's existing capacity, available feeder positions, and any necessary utility-side upgrades. The timeline could range from 12 to 24 months for a distribution-level interconnection, but this is subject to the utility's queue and study processes.
  • Utility-Specific IX Process and Typical Queue Times: The Interconnecting Utility is West Penn, a FirstEnergy subsidiary. FirstEnergy utilities generally follow FERC Order 2003/2222 interconnection procedures for wholesale projects, and state-specific rules for retail projects. West Penn's interconnection queue can be competitive, and typical study timelines (Feasibility, System Impact, Facilities) can add significant time. Specific queue analysis for the BOYERS substation and relevant feeders is essential.
  • Likely Feeder Configuration: The "POI Onsite" and close proximity to the BOYERS substation strongly suggest a direct tap into an existing distribution feeder emanating from that substation. The specific feeder configuration (e.g., radial, networked) and available capacity would need to be determined through a preliminary interconnection request.

4. Regulatory & Zoning Analysis

  • Authority Having Jurisdiction (AHJ) and its Type: The AHJ is listed as "Found (unnamed)". This is a critical gap. In Pennsylvania, zoning and land use are typically managed at the municipal (township or borough) level within the county. For Butler County, it is imperative to identify the specific township (e.g., Butler Township, Connoquenessing Township) where 2144 W Sunbury Rd is located. This will determine the specific zoning ordinances and planning department responsible.
  • Current Zoning for BESS Compatibility: The current zoning is Residential - Rural/Agricultural Residence (Code: -). This is a significant red flag and presents a major regulatory hurdle. BESS facilities are typically classified as industrial, utility, or heavy commercial uses, which are generally incompatible with residential or agricultural zoning districts.
  • Recommended Permitting Pathway: Given the incompatible zoning, a "by-right" permitting pathway is highly unlikely. The most probable pathways would be:
    • Conditional Use Permit (CUP) or Special Exception (SUP): This is the most common pathway for BESS in incompatible zones, requiring the applicant to demonstrate that the project meets specific conditions and criteria outlined in the zoning ordinance for such uses. This process involves public hearings and discretionary approval by the local planning commission and/or governing body.
    • Rezoning: This is a more arduous and time-consuming process, requiring a legislative change to the zoning map

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.