⚡ 2423 BOSTON RD

Hampden County, MA — Intake Report
📍 42.1476325, -72.448466 📐 5.16 acres 🏷️ APN: 339 115_0_205_589 🔌 📅 Generated July 01, 2026 09:59 AM 🆔 MA006650
BESS Score: /10 Buildable: ac Nearest Sub: PUTTS BRIDGE (2.0 mi) Zoning: Commercial (Retail) - Commercial (General)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

NORTHEAST AUTO REALTY LLC
5.16
339 115_0_205_589
Commercial (Retail) - Commercial (General) (BG)
Hampden County
25013
-

⚡ Infrastructure

PUTTS BRIDGE
2.0 mi
-999999 kV
345kV at 0.2 mi (CONNECTICUT LIGHT & POWER CO)
237 ft
Farmland of statewide importance
🔴 298 structures within 0.5 mi (setback/opposition risk)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
None within ~2 miles

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Wilbraham

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

Road Access: The subject property, located at 2423 Boston Road (U.S. Route 20), exhibits excellent road access. Boston Road is a major four-lane commercial arterial highway, providing direct and unobstructed entry for all vehicle types. This eliminates concerns regarding last-mile access through smaller residential or rural roads.

Equipment Delivery: The site's frontage on a U.S. highway is ideal for the delivery of heavy and oversized equipment. Lowboy trailers carrying main power transformers, switchgear, and containerized battery enclosures (40-53 ft) can access the site with ease. No significant road upgrades, turning radius improvements, or temporary closures of minor roads are anticipated, which represents a significant cost and time saving.

Terrain & Topography: Based on aerial imagery and the property's current use as a commercial auto dealership (Gary Rome Hyundai), the site is predominantly flat, paved, and has been previously graded. This is a highly favorable condition, as it will drastically reduce the need for extensive civil work, grading, and earthmoving. The existing level surface is well-suited for the precise placement of concrete pads for BESS containers and transformers.

Easement Concerns: Direct site access from a public right-of-way (Boston Rd) means no access easements over private third-party land are required for construction ingress and egress. However, an easement will be required for the interconnection gen-tie line, whether it runs 2.0 miles to the Putts Bridge Substation or 0.2 miles to the adjacent transmission line. Securing this gen-tie easement will be a critical path item.

2. Environmental Constraints

FEMA Flood Zone: The FEMA flood zone designation is currently listed as Unknown. This is a critical data gap and a high-priority diligence item. If the site is located within a Special Flood Hazard Area (e.g., Zone AE), it could trigger significant design changes, such as elevating all equipment above the Base Flood Elevation, leading to substantially higher civil engineering and construction costs. A designation in Zone X (minimal flood risk) is the desired outcome.

Wetlands: The presence of wetlands is also Unknown. Massachusetts has stringent wetland protection regulations under the Massachusetts Wetlands Protection Act (WPA). Any development within 100 feet of a designated wetland (the "Buffer Zone") requires a review and permit (Notice of Intent) from the local Conservation Commission. The discovery of wetlands on-site could reduce the buildable area and create a complex, lengthy permitting process. A desktop screening using MassGIS data followed by a formal field delineation is required.

Habitat & Protected Species: The data indicates no critical habitat or protected areas on or immediately adjacent to the site. Given its long-standing commercial use in a developed corridor, the risk of encountering endangered species is considered low. This should be confirmed via a Phase I Environmental Site Assessment (ESA).

Brownfield/Superfund Status: The site is not a listed brownfield, and there are no superfund sites within a two-mile radius. While this reduces potential environmental liability and cleanup costs, it is also a missed opportunity. The project will not be eligible for the 10% IRA Brownfield ITC adder, placing it at a financial disadvantage compared to projects on qualifying sites.

Pipeline Proximity: No major gas transmission pipelines are located in the immediate vicinity, mitigating risks associated with pipeline-related setbacks, construction restrictions, and safety protocols.

3.

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.