⚡ 4 BOSTON RD

Hampden County, MA — Intake Report
📍 42.1461618, -72.2818086 📐 21.67 acres 🏷️ APN: 227 3_6_1 🔌 38cc5e9a-3437-4974-ba4f-eb0a6dceb1f6 📅 Generated July 01, 2026 10:14 PM 🆔 MA006399
BESS Score: /10 Buildable: ac Nearest Sub: Palmer (1 mi) Zoning: Industrial (General) - Industrial (General)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

BRETON REALTY LLC
21.67
227 3_6_1
Industrial (General) - Industrial (General) (RR)
Battery Energy Storage
Hampden County
25013
-

⚡ Infrastructure

38cc5e9a-3437-4974-ba4f-eb0a6dceb1f6
Palmer
1 mi
115 kV kV
115kV at 0.6 mi (FITCHBURG GAS AND ELECTRIC LIGHT COMPANY)
442 ft
Farmland of statewide importance
🔴 131 structures within 0.5 mi (setback/opposition risk)
Public
POI Onsite
Good

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Palmer
City
Palmer Town

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

MEMORANDUM

TO: Sunland America Corp. Development Committee
FROM: Senior BESS Site Evaluation Analyst
DATE: October 26, 2023
SUBJECT: Comprehensive Site Diligence Analysis for 4 BOSTON RD, Palmer, MA (APN: 227 3_6_1)


This report provides a comprehensive due diligence analysis for the property located at 4 Boston Road in Palmer, Hampden County, Massachusetts. The analysis evaluates the site's suitability for a distribution-scale or utility-scale Battery Energy Storage System (BESS) project based on key development criteria.

1. Site Access & Topography

Road Access & Feasibility: The site has direct frontage on Boston Road (U.S. Route 20), a major public highway. This provides excellent, high-quality access for all phases of construction and operation. Delivery of heavy equipment, including multi-ton transformers, battery containers, and large cranes, is anticipated to be straightforward without the need for significant road improvements. Turning radii from a major highway onto the site should be more than adequate.

Terrain Characteristics: Based on aerial imagery and regional topography, the parcel appears to be relatively flat and largely cleared, which is highly advantageous. This "Good" buildability rating suggests minimal grading will be required, reducing civil engineering costs and construction timelines. The existing land use appears to be vacant industrial or commercial land.

Easement Concerns: While direct frontage is a major positive, a full title search is required to confirm that no restrictive access easements or other encumbrances exist that could impede development. The discrepancy in listed parcel size (21.67 acres vs. 12.66 acres in Regrid data) must be resolved via a survey and title review to confirm the exact boundaries and net acreage.

2. Environmental Constraints

This category presents the most significant data gaps and potential risks for the project.

  • FEMA Flood Zone: The flood zone designation is currently Unknown. This is a critical flaw in the preliminary data. Development within a Special Flood Hazard Area (e.g., Zone A, AE) would introduce substantial design challenges, increase costs for elevating equipment, and potentially make the project uninsurable or un-permittable. This must be investigated immediately via FEMA's Map Service Center.
  • Wetlands Presence: The presence of wetlands is also Unknown. Massachusetts has stringent wetland protection laws (Massachusetts Wetlands Protection Act), which typically enforce a 100-foot buffer zone around delineated resources. The presence of significant wetlands could severely constrain the buildable area. A desktop screening using MassGIS (MassMapper) is the immediate next step, to be followed by a formal field delineation by a certified professional.
  • Critical Habitat / Species Risk: The data indicates no critical habitat or protected areas on site, which is a positive initial finding. Standard diligence requires cross-referencing this with the U.S. Fish and Wildlife Service's IPaC tool and the Massachusetts Natural Heritage & Endangered Species Program (NHESP) database to confirm no sensitive species or habitats are present.
  • Brownfield/Superfund Status: The presence of a brownfield site within two miles is noted. This does not appear to pose a direct contamination risk to the subject parcel. However, it raises the question of IRA incentive eligibility. For the 10% Brownfield ITC adder, the project site itself must be a qualified brownfield. This does

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.