TO: Sunland America Corp. Development Committee
FROM: Senior BESS Site Evaluation Analyst
DATE: October 26, 2023
SUBJECT: Comprehensive Site Diligence Analysis – Palmer, MA (APN: 3_6_1)
This report provides a comprehensive due diligence analysis for the property located at 4 Boston Road in Palmer, Hampden County, Massachusetts. The site consists of approximately 12-22 acres of land zoned for industrial use. The analysis evaluates the property's suitability for a distribution-scale (≤5MW) Battery Energy Storage System (BESS) project based on key development criteria.
Road Access & Equipment Delivery: The property has frontage on Boston Road (U.S. Route 20), a major, publicly maintained thoroughfare. This provides excellent and direct access for all phases of construction and operation. The quality of the road is more than sufficient for heavy haul trucks carrying battery containers, medium-voltage transformers, and switchgear. No significant road upgrades are anticipated.
Terrain & Site Maneuverability: Given the "Industrial (General)" zoning and "Good" buildability rating, the site is presumed to be relatively flat, level, and potentially previously graded. This is highly advantageous, minimizing civil engineering costs associated with site preparation. However, a formal topographic survey is required for verification. Assuming favorable terrain, access for heavy equipment, including a 100-ton crane for setting transformers, appears feasible without major issue.
Easement Concerns: The data indicates "POI Onsite," which strongly suggests an existing utility easement is present along the property's road frontage. This is a positive factor, but the specific terms, width, and restrictions of this easement must be verified through a title search. We must ensure there are no restrictions that would prevent the installation of our BESS facility or its associated collection lines. A title report is a critical next step to identify any other access, drainage, or restrictive easements that could impact the site layout. There is a notable discrepancy in listed acreage (21.67 vs 12.66 acres) which must be resolved via survey and title review.
This category presents the most significant unknowns and potential risks for the project.
Grid Proximity: The site is in a strong location relative to grid infrastructure. It is 1 mile from the Palmer 115 kV Substation and 0.6 miles from a 115 kV transmission line. However, for