⚡ 6 OLD REED RD

Hampden County, MA — Intake Report
📍 42.1229169, -72.2816136 📐 10.03 acres 🏷️ APN: 191 167_002P 🔌 📅 Generated June 24, 2026 08:15 PM 🆔 MA005924
BESS Score: /10 Buildable: ac Nearest Sub: PALMER (1.9 mi) Zoning: Vacant Land - Residential-Vacant Land
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

PARRIS HUBERT N
10.03
191 167_002P
Vacant Land - Residential-Vacant Land (-)
Hampden County
25013
-

⚡ Infrastructure

PALMER
1.9 mi
115 kV
115kV at 0.9 mi (FITCHBURG GAS AND ELECTRIC LIGHT COMPANY)
693 ft
Farmland of statewide importance
🔴 38 structures within 0.5 mi (setback/opposition risk)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Loading from layers...

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

Site Access & Topography

Initial evaluation of the subject property at 6 Old Reed Rd reveals significant potential challenges related to site access and constructability. The quality of road access is currently listed as Requires Verification. A preliminary desktop review using satellite imagery suggests that Old Reed Road is a narrow, rural road, which may be unpaved or poorly maintained. This presents a substantial risk for the delivery of heavy and oversized equipment, including multi-ton battery containers, pad-mount transformers, and switchgear. A site visit is mandatory to assess the road's width, surface condition, turning radii, and any weight-limited bridges or culverts along the access route.

The terrain in this part of Hampden County, Massachusetts, is typically characterized by rolling hills. While the area immediately adjacent to the road may be relatively flat, topographical maps should be consulted to assess the grade across the entire parcel. A significant slope could dramatically increase civil engineering and site preparation costs, requiring extensive grading and the construction of retaining walls. The feasibility of maneuvering heavy cranes required for equipment placement is directly dependent on both road quality and on-site topography. Furthermore, the discrepancy in parcel size between county records (10.03 acres) and Regrid data (3.06 acres) must be resolved, as it directly impacts the available buildable area and layout flexibility. Finally, a title search is required to confirm that legal, insurable access exists from a public right-of-way and to identify any potential access easements that may be required from adjoining landowners, which could introduce negotiation delays and costs.

Environmental Constraints

The property carries several critical environmental unknowns that must be addressed. The FEMA flood zone designation is unknown; any location within a Special Flood Hazard Area (e.g., Zone A, AE) would likely render the site undevelopable for critical infrastructure like a BESS or impose prohibitive mitigation costs such as elevating all equipment above the Base Flood Elevation. Similarly, the presence of wetlands is unconfirmed. Massachusetts has stringent wetland protection laws (the Massachusetts Wetlands Protection Act), which enforce significant setbacks (typically 100-foot buffer zones) that could severely constrain the buildable envelope. A desktop screening using the National Wetlands Inventory (NWI) is an immediate first step, likely to be followed by a formal wetlands delineation by a certified professional.

On a positive note, the site is not within a designated critical habitat or protected area, and no pipelines are located in the immediate vicinity, reducing safety and setback concerns. The presence of a brownfield/superfund site within two miles is a noteworthy data point. While this proximity itself poses a risk of potential contaminant migration (which a Phase I Environmental Site Assessment would investigate), it also presents a potential opportunity. If the subject parcel itself can be classified as a "brownfield site" under IRA guidelines (e.g., due to prior contamination, being adjacent to a superfund site, or other specific conditions), the project could qualify for a valuable 10% ITC adder. This possibility warrants further investigation but should be considered speculative at this early stage.

Grid Infrastructure & Interconnection

Grid access is the most significant challenge for this site. The nearest substation, PALMER, is 1.9 miles away. For a distribution-scale project (≤5MW), this is a substantial distance that would require a costly and time-consuming line extension. The substation's maximum voltage of 115 kV indicates it is primarily a transmission-level facility, which may have limited distribution capacity available for a new project of this size. The interconnecting utility is likely National Grid, operating within the ISO-New England (ISO-NE) territory.

While a 115 kV transmission line is closer (0.9 miles), interconnecting a small 5 MW project at transmission voltage is typically not economically viable due to the high cost of protection and substation equipment required for a transmission tap. Therefore, the most probable interconnection path would be to a 3-phase distribution feeder. The location, voltage (e.g., 13.2 kV), and available capacity of the nearest distribution feeder are all critical unknowns. The project would be entirely dependent on extending a feeder from the PALMER substation or tapping an existing one along the 1.9-mile route. The estimated cost for such a line extension could easily range from $1.5M to $3.0M+, potentially making the project financially unfeasible. The ISO-NE interconnection queue is notoriously congested and slow-moving, with timelines from application to commercial operation often exceeding 36 months

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.