⚡ 740 RIDGE RD

Hampden County, MA — Intake Report
📍 42.1199747, -72.4101853 📐 3.94 acres 🏷️ APN: 339 1000_0_247_4119 🔌 📅 Generated June 25, 2026 02:09 PM 🆔 MA005732
BESS Score: /10 Buildable: ac Nearest Sub: WILBRAHAM (1.4 mi) Zoning: Heavy Industrial And Transportation/Communication - Cable Tv Station
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

R AND S REALTY LLC
3.94
339 1000_0_247_4119
Heavy Industrial And Transportation/Communication - Cable Tv Station (R60)
Hampden County
25013
-

⚡ Infrastructure

WILBRAHAM
1.4 mi
-999999 kV
345kV at 2.0 mi (CONNECTICUT LIGHT & POWER CO)
840 ft
Not prime farmland
🔴 78 structures within 0.5 mi (setback/opposition risk)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
None within ~2 miles

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Wilbraham

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

Site Access & Topography

The subject property at 740 Ridge Road in Wilbraham, MA, appears to have excellent road access. Ridge Road is a well-maintained, paved two-lane road that can likely accommodate heavy truck traffic. Based on satellite imagery, the site is currently developed with a small building and a large communications tower, indicating that construction and utility vehicles have previously accessed the parcel. The primary access point would be directly from Ridge Road.

The topography of the 3.94-acre parcel appears to be relatively flat and cleared, particularly in the areas not occupied by the existing infrastructure. This is a significant advantage, as it would likely minimize the need for extensive civil work and grading, thereby reducing site preparation costs. The industrial zoning (R-60) and surrounding land uses suggest that the local road network is designed to handle commercial and industrial traffic. Therefore, the delivery of heavy equipment, including multi-ton transformers, switchgear, and containerized battery enclosures, is anticipated to be feasible without major logistical hurdles.

A key unknown is the presence of any access easements. While direct frontage on Ridge Road is a positive, a formal title search and ALTA survey are required to confirm that no restrictive easements cross the property that could impede the optimal layout of the BESS facility or its access drive. We must also verify that there are no weight restrictions on local bridges or roads leading to the site that could impact delivery.

Environmental Constraints

The environmental profile of this site presents several critical unknowns that must be addressed immediately.

  • FEMA Flood Zone: The flood zone designation is currently Requires Verification. Siting a BESS within a Special Flood Hazard Area (e.g., Zone A, AE) would introduce significant design complexity and cost, requiring elevated foundations for all critical equipment, and may be prohibited by the local AHJ. A desktop analysis using FEMA's Map Service Center is the first step, followed by a formal flood zone determination.
  • Wetlands: The presence of wetlands is also unknown and Requires Verification. Massachusetts has stringent wetland protection regulations (Massachusetts Wetlands Protection Act). The presence of jurisdictional wetlands could drastically reduce the buildable area due to required buffer zones (typically 100 feet or more), potentially rendering the 3.94-acre parcel too small for a viable project. A wetlands delineation by a certified professional is a critical-path due diligence item.
  • Habitat & Species: The data indicates no critical habitat or protected areas on site, which is a significant positive, reducing the risk of lengthy and complex consultations with state or federal wildlife agencies (e.g., USFWS, MA Natural Heritage & Endangered Species Program).
  • Site Contamination: The absence of known brownfield or superfund sites within a 2-mile radius is a double-edged sword. It lowers the risk of encountering soil or groundwater contamination, which would trigger costly remediation. However, it also means the project is ineligible for the 10% IRA brownfield bonus adder, a notable economic disadvantage.
  • Pipelines: No major pipelines within 3 miles is a strong safety and layout advantage, eliminating concerns related to pipeline operator easements, setback requirements, and explosion risks.
  • Chesapeake Bay Critical Area: This is not applicable as the site is in Massachusetts.

Grid Infrastructure & Interconnection

The site's viability is heavily dependent on the feasibility and cost of interconnection. The nearest identified substation is the WILBRAHAM substation, located approximately 1.4 miles from the parcel. This distance is manageable but will result in a significant interconnection cost for a distribution-tie line extension, likely in the range of $1.5M - $3.0M, depending on terrain, pole requirements, and road crossings.

A major data gap and risk is the substation's voltage class, listed as "-999999 kV," which is an error. This Requires Verification immediately. The interconnecting utility is likely Eversource, which operates in this region. Typical distribution voltages in the area are 13.8kV or 23kV. For a project of ≤5MW, a distribution-level interconnection is the only economically viable path. The nearby 345kV transmission line is not a feasible Point of Interconnection (POI) for a project of this scale due to prohibitive substation and equipment costs.

The likely feeder configuration would be a new dedicated 3-phase overhead or underground distribution line from the Wilbraham substation to the project site. We must assume there is no existing 3-phase power of sufficient capacity directly adjacent to the site. The interconnection process in Massachusetts is governed by ISO-New England (ISO-NE) tariffs and managed by the utility (Eversource). This process is notoriously slow, with queue times for study and approval often exceeding 18-24 months. Furthermore, the capacity of the Wilbraham substation and the specific feeder we would connect to is unknown. A formal interconnection pre-application must be filed with Eversource to determine if there is available capacity without requiring costly substation upgrades.

Regulatory & Zoning Analysis

The Authority Having Jurisdiction (AHJ) is the Town of Wilbraham. The property is zoned R-60, described as "Heavy Industrial And Transportation/Communication." This is highly favorable for BESS development, as industrial zones are generally the most permissive for this type of use.

Crucially, research indicates that the Town of Wilbraham has adopted a specific zoning bylaw for Large-Scale Battery Energy Storage Systems (Section 13 of the Zoning Bylaws). This provides a clear, albeit potentially rigorous, permitting path. BESS is not a by-right use; it requires a Special Permit from the Planning Board. This process will involve a public hearing, site plan review, detailed engineering plans, a decommissioning plan, and an emergency response plan. While the existence of a specific bylaw reduces regulatory uncertainty, it also means the project will face a high level of scrutiny. We must thoroughly review the bylaw's specific requirements, including noise limits, aesthetic screening, and setback requirements, which are likely more stringent than the base industrial zone setbacks. Early, proactive engagement with the Wilbraham Planning Department is essential to understand their expectations and any potential concerns.

IRA/ITC Incentive Analysis

The project's eligibility for Investment Tax Credit (ITC) adders under the Inflation Reduction Act (IRA) is extremely poor, which presents a major challenge to its financial viability.

  • Opportunity Zone: No. The project is not eligible for the 10% adder.
  • Energy Community: No. The project is not located in a qualifying census tract, brownfield, or coal closure area, making it ineligible for the 10% adder.
  • Low-Income Community: No. The project does not appear to qualify under the available categories for this 10% or 20% adder.

As a result, the project is only eligible for the base 30% ITC (assuming prevailing wage and apprenticeship requirements are met). The potential cumulative ITC is 30%. This lack of any bonus credits puts the project at a significant competitive disadvantage compared to projects in more favorable locations that can stack adders to achieve a 40% or 50% ITC.

BESS Score & Rationale

BESS Suitability Score: 52/100

  • Location (12/20): Proximity to a substation is good, but the 1.4-mile distance is not ideal. The overall location within the ISO-NE market is viable, but lacks specific locational advantages.
  • Grid Access (10/25): The 1.4-mile distance to the substation creates a high-cost, high-risk interconnection. The unknown substation voltage/capacity and the notoriously long ISO-NE queue timelines are major detractors. This is the project's weakest attribute.
  • Environmental (11/15): The site appears clean with no critical habitats or contamination issues. However, the score is penalized due to the critical unknowns of flood zone and wetlands, which could be fatal flaws.
  • Regulatory (12/15): The industrial zoning and existence of a specific BESS bylaw are major positives that create a clear (though demanding) permitting path. This is a strong point for the site.
  • Incentives (2/15): This is a critical failure point. Qualifying for only the base 30% ITC makes the project economics extremely challenging and uncompetitive.
  • Buildability (5/10): The parcel is small at 3.94 acres. After accounting for setbacks, access roads, and potential wetland buffers, the remaining area may be insufficient for a 5MW BESS, which typically requires

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.