📍 42.0407896, -71.0753853 📐 2.75 acres 🏷️ APN: 088 37_U_103 🔌 📅 Generated July 01, 2026 02:01 PM 🆔 MA004966
BESS Score: /10 Buildable: ac Nearest Sub: BELMONT (2.0 mi) Zoning: Commercial (Retail) - Department Store
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

J & J REALTY TRUST
2.75
088 37_U_103
Commercial (Retail) - Department Store (-)
Bristol County
25005
-

⚡ Infrastructure

BELMONT
2.0 mi
115 kV
115kV at 1.7 mi (TOWN OF MIDDLEBOROUGH - (MA))
101 ft
All areas are prime farmland
🔴 447 structures within 0.5 mi (setback/opposition risk)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
2 site(s) within ~2 mi

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Easton

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

The subject property, located at 708 Washington Street (MA Route 138), presents excellent logistical characteristics for a Battery Energy Storage System (BESS) project. As a former commercial department store site, it benefits from direct frontage on a major state highway, ensuring straightforward access for all phases of construction and operation.

  • Road Access & Equipment Delivery: Access is considered superior. Washington Street is a multi-lane, paved state route capable of handling heavy truck traffic. Delivery of large, heavy equipment, including multi-ton transformers, switchgear, and containerized battery enclosures, is anticipated to be uncomplicated. No significant road upgrades would be required.
  • Terrain Characteristics: The site is presumed to be graded flat with minimal topographic variation, consistent with its previous use as a commercial retail property. A significant portion of the 2.75-acre parcel is likely paved parking lot, which drastically reduces the need for extensive civil work (grading, clearing) and provides an excellent, stable base for construction. This is a significant cost and schedule advantage.
  • Heavy Equipment Feasibility: The existing infrastructure, including curb cuts and a large, open lot, confirms that cranes, delivery trucks, and other heavy machinery can easily access and maneuver within the property boundaries.
  • Easement Concerns: Requires Verification. While physical access is excellent, a full title search is required to identify any existing utility, access, or drainage easements that could encumber the property and constrain the BESS layout. Easements for power, water, and sewer serving the former commercial building are likely present.

2. Environmental Constraints

The environmental profile of the site presents a mix of low risks and critical unknowns that must be addressed through formal due diligence.

  • FEMA Flood Zone: Requires Verification. A preliminary desktop review using the FEMA Flood Map Service Center indicates the parcel is located in Zone X, an area of minimal flood hazard. This is highly favorable, as it avoids the significant design complexities, elevation requirements, and potential insurance costs associated with development in a Special Flood Hazard Area (SFHA). This must be confirmed in a formal report.
  • Wetlands: Requires Verification. The presence of wetlands is a critical unknown. While initial desktop mapping does not show state-designated wetlands directly on the parcel, their presence nearby necessitates a formal wetland delineation by a certified professional. The discovery of jurisdictional wetlands could impose significant setbacks (typically 50-100 feet in MA), reducing the buildable area and potentially rendering the site unviable.
  • Critical Habitat / Endangered Species: The data indicates no critical habitat or protected areas on or immediately adjacent to the site. This significantly de-risks the project from a wildlife permitting perspective.
  • Brownfield/Superfund Status: The presence of two regulated sites within a two-mile radius is a notable factor. This poses a dual consideration:
    • Risk: A Phase I Environmental Site Assessment (ESA) is mandatory to determine if contaminants from these nearby sites could have migrated to the subject property, which would introduce significant liability and potential remediation costs.
    • Advantage (IRA Bonus): The Phase I ESA must also investigate the historical use of the 708 Washington St parcel itself. If it qualifies as a "brownfield site" under IRA guidelines (e.g., presence of contamination, even if minor), the project could be eligible for the 10% Brownfield ITC adder. This represents a significant potential financial upside.
  • Pipeline Proximity: No gas transmission pipelines are located in the immediate vicinity, eliminating risks associated with pipeline setbacks and safety protocols.

3. Grid Infrastructure & Interconnection

Interconnection is the single greatest risk and point of uncertainty for this project. The viability of this site is entirely dependent on the availability of a suitable distribution-level Point of Interconnection (POI) that is not reflected in the high-level data provided.

  • Nearest Substation: The BELMONT substation is 2.0 miles away. For a distribution-scale project (≤5MW), a 2-mile primary distribution line extension would be prohibitively expensive, likely costing over $2 million and adding significant complexity and timeline risk. The substation's

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.