⚡ 7 JOB'S ISLAND RD

Plymouth County, MA — Intake Report
📍 41.7526386, -70.7266096 📐 3.12 acres 🏷️ APN: 310 48_1058 🔌 📅 Generated June 26, 2026 09:17 AM 🆔 MA003149
BESS Score: /10 Buildable: ac Nearest Sub: UNKNOWN170875 (0.5 mi) Zoning: Vacant Land - Residential-Vacant Land
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

ROGERS FANNIE W ET ALS
3.12
310 48_1058
Vacant Land - Residential-Vacant Land (-)
Plymouth County
25023
-

⚡ Infrastructure

UNKNOWN170875
0.5 mi
-999999 kV
115kV at 2.9 mi (NOT AVAILABLE)
11 ft
Not prime farmland
🔴 587 structures within 0.5 mi (setback/opposition risk)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Wareham

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

The subject property at 7 Job's Island Road presents significant access challenges for a BESS project. Initial desktop analysis using aerial imagery indicates that Job's Island Road is a narrow, two-lane residential road, potentially with limited shoulder space and no sidewalks. The quality of the road surface is Requires Verification, but it does not appear to be designed for heavy industrial traffic.

Equipment Delivery Feasibility: The primary concern is the delivery of oversized and overweight equipment, including multi-ton transformers and prefabricated BESS containers (typically transported on 53-foot low-boy trailers). The turn radii from main thoroughfares like Route 6 onto the local road network leading to the site must be evaluated by a logistics expert. The structural capacity of Job's Island Road and any small bridges or culverts en route is a critical unknown that must be confirmed with the Town of Wareham's Department of Public Works.

Terrain Characteristics: Located in coastal Massachusetts, the parcel is expected to be relatively flat, which is advantageous for minimizing civil work. However, its proximity to the Weweantic River estuary suggests it is low-lying, which poses significant flood and geotechnical risks. A formal topographical survey and geotechnical study would be required to confirm soil stability and the water table height.

Access Easements: The parcel appears to have direct frontage on Job's Island Road. However, if road widening or temporary construction laydown areas are needed, temporary construction easements from adjacent residential landowners would be necessary. Securing these in a residential neighborhood can be difficult and costly.

2. Environmental Constraints

The site's coastal location presents a high probability of significant environmental constraints that could render it un-developable for this use.

  • FEMA Flood Zone: The designation is listed as Unknown. Given the site's immediate proximity to a tidal estuary, it is highly likely to fall within a FEMA Special Flood Hazard Area (SFHA), such as Zone AE (1% annual chance flood) or even Zone VE (coastal high hazard area). Development within these zones requires that all critical equipment, including battery enclosures and inverters, be elevated above the Base Flood Elevation (BFE), adding substantial cost and complexity. Development in a VE zone is often prohibitive. This is a potential fatal flaw.
  • Wetlands: The presence of wetlands is Unknown but highly probable due to the adjacent river and coastal ecosystem. A wetland delineation per the Massachusetts Wetlands Protection Act (WPA) and local Wareham bylaws is an immediate requirement. The WPA mandates significant buffer zones (typically 100 feet) around delineated wetlands, which could severely restrict the buildable area on this small 3.12-acre parcel.
  • Critical Habitat / Endangered Species: While the database shows no critical habitat on-site, a formal screening via the USFWS IPaC tool and consultation with the Massachusetts Natural Heritage & Endangered Species Program (NHESP) is necessary to confirm no state or federally listed species are present.
  • Brownfield/Superfund Status: The presence of a brownfield site within 2 miles is noted. This is not a risk to the subject parcel unless contamination has migrated, but it presents a potential opportunity. If this specific parcel could be classified as a brownfield (e.g., due to historical undocumented dumping), it could qualify for the 10% ITC adder under the Inflation Reduction Act (IRA). A Phase I Environmental Site Assessment (ESA) is required to investigate this possibility.
  • Pipeline Proximity: No gas transmission pipelines are located nearby, which is a positive, eliminating a common safety and setback constraint.

3. Grid Infrastructure & Interconnection

The site's primary advantage is its proximity to grid infrastructure, though critical details are missing.

  • Nearest Substation: A substation is listed as 0.5 miles away. This is an excellent distance for a distribution-scale project, minimizing line loss and construction costs for the generator lead line. The utility is likely Eversource. The substation name "UNKNOWN170875" and voltage "-999999 kV" are data errors. Verification of the actual substation name, owner (Eversource), and its capacity is a top priority.
  • Transmission Access: The nearest transmission line (115kV at 2.9 miles) is too distant and high-voltage for a ≤5MW project. Interconnection at the transmission level would be economically infeasible.
  • Recommended Interconnection: The only viable path is a distribution-level interconnection, likely at 13.8kV, to the nearby substation. This aligns with our target project size.
  • Estimated Cost & Timeline: A 0.5-mile overhead

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.