⚡ 32 SCOTLAND BLVD

Plymouth County, MA — Intake Report
📍 41.9748508, -71.0081265 📐 4.75 acres 🏷️ APN: 042 59_5_0 🔌 📅 Generated June 25, 2026 01:21 PM 🆔 MA003013
BESS Score: /10 Buildable: ac Nearest Sub: BRIDGEWATER (0.5 mi) Zoning: Industrial (General) - Warehouse (Industrial)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

32 SCOTLAND LLC
4.75
042 59_5_0
Industrial (General) - Warehouse (Industrial) (-)
Plymouth County
25023
-

⚡ Infrastructure

BRIDGEWATER
0.5 mi
345 kV
115kV at 0.2 mi (TOWN OF MIDDLEBOROUGH - (MA))
82 ft
Not prime farmland
🔴 225 structures within 0.5 mi (setback/opposition risk)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
None within ~2 miles

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Loading from layers...

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

Road Access: The property is located at 32 Scotland Boulevard, which is a paved, two-lane industrial road within an established industrial park in Bridgewater, MA. A preliminary review via satellite imagery indicates the road is well-maintained and appears suitable for heavy truck traffic, including semi-trailers for delivering battery containers, inverters, and transformers. The site has direct frontage on Scotland Boulevard, simplifying access logistics.

Terrain Characteristics: The topography in this region of Plymouth County is generally flat with minimal elevation change. Satellite imagery confirms the parcel itself appears to be level and cleared in the front portion, with some tree cover towards the rear. This is highly favorable as it will minimize civil engineering costs associated with grading and site preparation. A formal topographic survey is required for confirmation.

Heavy Equipment Feasibility: Access for heavy equipment, such as a 100-ton crane for setting transformers and battery enclosures, appears feasible. The route from major highways (like I-495) to the site via roads like Route 24 and Route 104 seems straightforward. However, a full logistics and transportation study must be conducted to verify bridge weight limits, turning radii, and any potential overhead line clearance issues along the final delivery route.

Easement Concerns: Requires Verification. As an industrial parcel, there is a moderate risk of pre-existing utility easements (e.g., for gas, water, sewer, or electrical lines) crossing the property. A full ALTA survey and title report are critical to identify any such easements, as they could significantly constrain the final site layout and the placement of BESS equipment.

2. Environmental Constraints

FEMA Flood Zone: A preliminary check of the FEMA Flood Insurance Rate Maps indicates the parcel is located in Zone X. This is an area of minimal flood hazard, outside of the 0.2% annual chance (500-year) floodplain. This is a significant advantage, as it eliminates the need for costly flood mitigation measures and simplifies permitting.

Wetlands: Requires Verification. The US FWS National Wetlands Inventory mapper suggests the potential presence of freshwater forested/shrub wetlands along the eastern and southern boundaries of the parcel. This is a major potential constraint. Under the Massachusetts Wetlands Protection Act, activities are restricted within a 100-foot buffer zone of designated wetlands. This could substantially reduce the 4.75-acre site's buildable area and will require a formal wetland delineation by a certified professional to confirm the exact boundaries and impact.

Critical Habitat / Endangered Species: The provided data indicates no critical habitat on site. This is a positive finding that reduces permitting complexity. A desktop review using the Massachusetts Natural Heritage & Endangered Species Program (NHESP) Priority Habitat maps should be conducted as a final check.

Brownfield/Superfund Status: The site is not a designated brownfield, nor is it near a Superfund site. While this mitigates potential environmental liability and cleanup costs, it also means the project is ineligible for the 10% IRA brownfield tax credit adder. This is a financial disadvantage compared to alternative sites.

Pipeline Proximity: The absence of major gas transmission pipelines within a 3-mile radius is a significant safety and permitting benefit, eliminating the need for specialized setback studies and safety protocols related to pipeline hazards.

3. Grid Infrastructure & Interconnection

Nearest Substation & Capacity: The BRIDGEWATER substation is located only 0.5 miles from the site. This is an exceptionally close and highly desirable distance, which will dramatically reduce the cost and complexity of the generator lead line. The substation's maximum voltage of 345 kV indicates it is a major bulk power system node, suggesting high available capacity and multiple interconnection options. The interconnecting utility is likely National Grid, which serves this area. This requires verification.

Transmission & Distribution Lines: A 115 kV transmission line is located just 0.2 miles from the parcel, providing a clear and viable transmission-level interconnection option. Furthermore, 3-phase distribution feeders, likely at 13.8 kV, are expected to run along Scotland Boulevard, originating from the Bridgewater substation.

Recommended Interconnection: For a distribution-scale project (≤5MW), the most cost-effective and logical path is to interconnect to a local 13.8 kV distribution feeder. This avoids the higher costs and more stringent technical requirements of a 115 kV transmission tap. A pre-application must be filed with the utility to confirm the feeder has sufficient capacity to accommodate the project's injection.

Estimated Cost & Timeline: For a 0.5-mile distribution tie-in, a preliminary cost estimate is in the range of $1.5M - $3.0M. This is highly dependent on required utility upgrades (e.g., re-conductoring, substation breaker upgrades). The interconnection process will be governed by ISO New England (ISO-NE), whose queue is known to be congested. The estimated timeline from application submission to commercial operation is

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.