⚡ 91 FREDETTE ST

Worcester County, MA — Intake Report
📍 42.5709959, -72.0120771 📐 2.12 acres 🏷️ APN: 103 M22-11-7 🔌 38cc5e9a-3437-4974-ba4f-eb0a6dceb1f6 📅 Generated June 30, 2026 02:25 PM 🆔 MA002385
BESS Score: /10 Buildable: ac Nearest Sub: Crystal Lake (1.7 mi) Zoning: Heavy Industrial And Transportation/Communication - Truck Terminal (Motor Freight)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

MANCA JOHN F & DORINA G TRSTES
2.12
103 M22-11-7
Heavy Industrial And Transportation/Communication - Truck Terminal (Motor Freight) (-)
Battery Energy Storage
Worcester County
25027
-

⚡ Infrastructure

38cc5e9a-3437-4974-ba4f-eb0a6dceb1f6
13.8 kV
Crystal Lake
1.7 mi
69 kV kV
None within ~3 miles
960 ft
Not prime farmland
🔴 606 structures within 0.5 mi (setback/opposition risk)
Public
POI Onsite
Good

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
13 site(s) within ~2 mi

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Gardner
City
Gardner

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

MEMORANDUM

TO: Sunland America Corp. Development Committee
FROM: Senior BESS Site Evaluation Analyst
DATE: October 26, 2023
SUBJECT: Comprehensive Site Diligence Analysis – Project Gardner (91 Fredette St, Gardner, MA)


This report provides a comprehensive due diligence analysis for the property located at 91 Fredette Street in Gardner, Worcester County, Massachusetts (APN: M22-11-7). The 2.12-acre parcel is being evaluated for its suitability as a distribution-scale Battery Energy Storage System (BESS) project. The analysis covers key development pillars including site access, environmental constraints, grid infrastructure, regulatory approvals, and incentive eligibility.

1. Site Access & Topography

The subject property benefits from excellent physical access. It is served by a public road, Fredette Street, which appears to be a well-maintained, paved industrial road capable of supporting heavy vehicle traffic. The site's historical and current land use as a "Truck Terminal" strongly suggests that the local road network is designed for semi-trailer trucks and other oversized vehicles.

  • Equipment Delivery: Feasibility for delivering heavy equipment, including multi-ton transformers and containerized BESS units, is considered high. The industrial zoning and existing infrastructure are significant advantages. Action Item: A desktop route analysis should be conducted to verify bridge weight limits and turning radii from the nearest state highway to the site.
  • Terrain Characteristics: Based on aerial imagery and the site's industrial nature, the topography is presumed to be relatively flat and graded, which is ideal for BESS construction. The "Good" buildability rating supports this assumption, minimizing the need for extensive civil work and associated costs.
  • Easement Concerns: While road access is public, a full title search is required to identify any potential access, utility, or restrictive easements that could encumber the property and constrain the developable area. The "POI Onsite" designation is positive but does not preclude the existence of other utility easements that must be accounted for in the site layout.

2. Environmental Constraints

Environmental factors present the most significant unknowns and potential risks for this site. The industrial history of the area requires careful and immediate investigation.

  • FEMA Flood Zone: The flood zone designation is currently "Unknown." This is a critical data gap. Development within a Special Flood Hazard Area (e.g., Zone AE) would trigger significant design changes, such as elevating all equipment above the Base Flood Elevation, leading to substantial cost increases. A location within a floodway would likely render the site undevelopable. This must be verified immediately via the FEMA Flood Map Service Center.
  • Wetlands: The presence of wetlands is "Unknown." Massachusetts has stringent wetland protection regulations (Massachusetts Wetlands Protection Act) with significant buffer zones (typically 100 feet) that can severely limit the buildable area. A desktop screening using MassGIS OLIVER is the first step, to be followed by a formal wetland delineation by a certified professional if any indicators are present.
  • -
  • Brownfield/Superfund Status: The presence of 13 known brownfield or superfund sites within a two-mile radius is a major concern. It increases the likelihood that this parcel, a former truck terminal, may have soil or groundwater contamination (e.g., from fuel spills or hydraulic fluid leaks). This poses a significant liability and potential for costly remediation. However, this risk is coupled with an opportunity: if the site itself qualifies as a brownfield under IRA guidelines, the project could be eligible for a 10% ITC adder. A Phase I Environmental Site Assessment (ESA) is non-negotiable and should be commissioned immediately.
  • Critical Habitat & Pipelines: The data indicates no critical habitats or protected areas on or near the site, which is a positive finding. The absence of pipelines within a three-mile radius eliminates risks associated with explosion hazards and setback requirements.

3. Grid Infrastructure & Interconnection

The site's grid infrastructure characteristics are exceptionally strong and represent its primary advantage.

  • Point of Interconnection (POI): The data indicates the POI is "Onsite" at the target distribution voltage of 13.8 kV. This is a best-case scenario, potentially saving hundreds of thousands to over a million dollars in line extension costs and significantly simplifying the engineering and permitting process. The likely configuration is a 3-phase overhead or underground distribution feeder running along the property boundary or

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.