⚡ 91 FREDETTE ST

Worcester County, MA — Intake Report
📍 42.5709959, -72.0120771 📐 2.12 acres 🏷️ APN: 103 M22-11-7 🔌 📅 Generated June 29, 2026 04:48 PM 🆔 MA002385
BESS Score: /10 Buildable: ac Nearest Sub: UNKNOWN133570 (1.1 mi) Zoning: Heavy Industrial And Transportation/Communication - Truck Terminal (Motor Freight)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

MANCA JOHN F & DORINA G TRSTES
2.12
103 M22-11-7
Heavy Industrial And Transportation/Communication - Truck Terminal (Motor Freight) (-)
Worcester County
25027
-

⚡ Infrastructure

UNKNOWN133570
1.1 mi
69 kV
None within ~3 miles
960 ft
Not prime farmland
🔴 606 structures within 0.5 mi (setback/opposition risk)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
13 site(s) within ~2 mi

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Gardner

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

Road Access & Equipment Delivery: The property is located on Fredette Street in Gardner, MA. A preliminary review of aerial imagery indicates Fredette Street is a paved, two-lane industrial road. It appears to connect directly to major local thoroughfares, suggesting it is designed to accommodate heavy truck traffic, which is consistent with its "Truck Terminal" land use designation. This is a significant advantage for the delivery of heavy and oversized BESS equipment, such as multi-ton battery containers, power conversion systems (PCS), and the main power transformer. The primary access point appears to be directly off Fredette Street.

Terrain & Topography: Based on its location within an established industrial area of central Massachusetts, the site is likely to be relatively flat and previously graded. While the broader region has rolling hills, industrial parcels like this are typically prepared for development, minimizing the need for extensive earthwork. This assumption significantly reduces potential civil engineering costs and construction complexity. Requires Verification: A formal topographic survey is required to confirm site grades and drainage patterns.

Heavy Equipment Feasibility: Given the industrial-grade road access and likely flat terrain, access for heavy equipment such as a 100-ton crane (for transformer placement) and flatbed trucks is considered highly feasible. The key constraint will be the on-site circulation and laydown area within the 2.12-acre parcel.

Easement Concerns: The parcel has direct frontage on Fredette Street, which likely mitigates the need for off-site access easements. However, a full title report is necessary to identify any existing utility easements (e.g., for gas, water, sewer, or existing electrical lines) that may cross the property and conflict with the proposed BESS layout. The small size of the parcel makes any restrictive easement a potential fatal flaw.

2. Environmental Constraints

FEMA Flood Zone: The FEMA flood zone designation is currently unknown. This is a critical data gap. If the site is located in a Special Flood Hazard Area (e.g., Zone A or AE), development costs could increase substantially due to requirements for elevating all equipment above the Base Flood Elevation, or the site may be rendered undevelopable. Requires Verification: Immediate review of the FEMA Flood Insurance Rate Maps (FIRMs) for this location is a top priority. An ideal designation is Zone X (minimal flood risk).

Wetlands: The presence of wetlands is unknown. Massachusetts has stringent wetland protection regulations under the Massachusetts Wetlands Protection Act (WPA). The presence of jurisdictional wetlands could trigger significant buffer/setback requirements (typically 100 feet), which would severely constrain development on a small 2.12-acre lot. Requires Verification: A desktop review using MassGIS and the National Wetlands Inventory (NWI) is the first step, likely followed by a formal wetland delineation by a certified professional.

Critical Habitat / Endangered Species: The initial screen shows no critical habitat or protected areas on site, which is a positive finding. This reduces the risk of project delays or costly mitigation measures associated with state or federal endangered species acts. This should be confirmed via the MassWildlife NHESP database during formal diligence.

Brownfield/Superfund Status: The data indicates 13 brownfield or superfund sites within a two-mile radius, though the subject parcel itself is not listed. This presents both a risk and a significant opportunity. The risk is potential on-site contamination from historical industrial use in the area, which would require remediation. The opportunity is that if the site's history qualifies it as a "brownfield site" under IRA guidelines (even with minor contamination), the project could be eligible for a 10% ITC bonus adder. This potential adder is a major value driver and warrants immediate investigation.

Pipeline Proximity: No major gas transmission pipelines are identified within three miles, mitigating risks related to pipeline-specific setbacks, safety protocols, and potential easement conflicts.

3. Grid Infrastructure & Interconnection

Nearest Substation & Grid Assets: The nearest substation, UNKNOWN133570, is located 1.1 miles from the site and has a maximum voltage of 69 kV. This distance is moderate; it is not ideal, but it is often feasible. The 69 kV bus indicates a robust point in the grid, likely with capacity to handle a 5 MW

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.