⚡ 277 E MAIN ST

Worcester County, MA — Intake Report
📍 42.2252623, -72.0489271 📐 4.86 acres 🏷️ APN: 084 004.2_0130_0037.0 🔌 📅 Generated June 25, 2026 01:20 PM 🆔 MA001562
BESS Score: /10 Buildable: ac Nearest Sub: TAP162179 (1.3 mi) Zoning: Industrial (General) - Industrial (General)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

MOLINA, JOSE
4.86
084 004.2_0130_0037.0
Industrial (General) - Industrial (General) (C)
Worcester County
25027
-

⚡ Infrastructure

TAP162179
1.3 mi
69 kV
None within ~3 miles
613 ft
Farmland of statewide importance
🔴 294 structures within 0.5 mi (setback/opposition risk)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
None within ~2 miles

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Loading from layers...

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

The subject property at 277 E Main St benefits from excellent road access, as it has direct frontage on Massachusetts Route 9 (E Main St), a major two-lane state highway. Based on aerial and street-level imagery, this road is well-maintained, paved, and appears capable of supporting heavy truck traffic, which is critical for the delivery of large BESS equipment such as battery containers, power conversion systems (PCS), and the main power transformer. The site appears to have an existing unpaved access point off E Main St, but a formal, engineered construction entrance would be required.

The topography of the 4.86-acre parcel appears to be generally flat and level, particularly the portion fronting the road, which is a significant advantage for minimizing civil engineering and earthwork costs. The parcel is currently wooded, so clearing and grubbing will be necessary. The key consideration for equipment delivery will be maneuvering delivery vehicles from the highway onto the site. A traffic management plan will likely be required by the Massachusetts Department of Transportation (MassDOT) and the Town of East Brookfield during construction. There are no apparent access easement concerns as the property has direct, ample frontage on a public right-of-way. However, a formal ALTA survey is required to confirm the absence of any conflicting easements across the property itself.

2. Environmental Constraints

The environmental profile of this site presents several critical unknowns that must be addressed immediately.

  • FEMA Flood Zone: The flood zone designation is currently Unknown. This is a high-priority diligence item. If the site is located within a Special Flood Hazard Area (e.g., Zone A or AE), development costs could increase substantially due to requirements for elevating equipment above the Base Flood Elevation (BFE), or portions of the site could be undevelopable. A desktop FEMA map review is the immediate next step.
  • Wetlands: The presence of wetlands is also Unknown. Given the site's undeveloped, wooded nature in a region with numerous water bodies, there is a moderate to high risk of jurisdictional wetlands being present. A formal wetland delineation by a certified professional is mandatory. The presence of wetlands would trigger significant state (Massachusetts Wetlands Protection Act) and federal (Clean Water Act) regulations, requiring setbacks (typically 50-100 feet) that would reduce the buildable area.
  • Critical Habitat / Endangered Species: The initial data indicates no critical habitat on site, which is a positive sign. However, this must be verified through the Massachusetts Natural Heritage & Endangered Species Program (NHESP) database to ensure no state-listed rare species or priority habitats are present, which could trigger further review or mitigation requirements.
  • Brownfield/Superfund Status: The site is not located near a brownfield or superfund site. While this eliminates the risk of legacy contamination issues, it also means the project is ineligible for the 10% IRA brownfield tax credit adder, a slight disadvantage from a project finance perspective.
  • Pipeline Proximity: The absence of major gas pipelines within three miles is a significant safety and layout advantage, eliminating the need for specialized setbacks and safety consultations with pipeline operators.

3. Grid Infrastructure & Interconnection

The grid infrastructure near this site is highly promising. The nearest substation, TAP162179, is located approximately 1.3 miles away and has a maximum voltage of 69 kV. This proximity is very favorable for a distribution-scale project.

  • Interconnection Point: While the substation has a 69 kV bus, a direct 69 kV interconnection for a ≤5MW project would be unnecessarily expensive and complex. The most viable and cost-effective strategy is to interconnect to a distribution feeder originating from this substation. Street-level imagery confirms the presence of a three-phase overhead distribution line running directly along the site's frontage on E Main St. This is a major advantage, potentially reducing the interconnection cost from millions (for a new 1.3-mile line) to a few hundred thousand dollars for a simple line tap and required upgrades.
  • Interconnecting Utility: The utility for East Brookfield is National Grid. We must follow their specific interconnection process for projects in Massachusetts, which is governed by state tariffs and overseen by the DPU.
  • Cost & Timeline: Assuming a distribution tap to the adjacent overhead line is feasible, the interconnection cost could be in the range of $250,000 - $750,000, depending on the feeder's available capacity and the extent of protection and communication upgrades required at the substation. The interconnection process in ISO-New England territory is notoriously slow; a realistic timeline from application submission to commercial operation is 24-36 months. Submitting a formal interconnection application to National Grid is a critical path item to secure a queue position and receive a formal feasibility and cost study.
  • Likely Voltage: The distribution voltage is likely 13.2 kV or a similar class, which is ideal for a 5 MW BESS project.

4. Regulatory & Zoning Analysis

The regulatory outlook is a key strength for this site. The Authority Having Jurisdiction (AHJ) is the Town of East Brookfield. The property is zoned "Industrial (General) (Code: C)," which is typically the most favorable designation for BESS development.

  • Permitting Pathway: A review of the Town of East Brookfield's Zoning Bylaws indicates that a "Public utility facility" is an allowed use within the Industrial District, subject to a Special Permit from the Planning Board (Section 4.3.3). This provides a clear, defined permitting path. It is not a by-right use, meaning it will require public hearings and discretionary approval from the board, but it is explicitly allowed, which avoids the need for a more challenging use variance.
  • Setbacks & Requirements: Specific setback requirements for BESS are not explicitly defined in the bylaws. Therefore, the standard Industrial District setbacks for structures will apply. We will need to propose and justify appropriate setbacks based on NFPA 855 standards and industry best practices during the special permit application process.
  • Moratorium Risk: As a small town, there is always a risk of local opposition leading to discussions of a moratorium if the project is not presented carefully. Proactive community outreach and engagement with the Planning Board and Fire Department will be essential to build support and address concerns early.

5. IRA/ITC Incentive Analysis

The project's eligibility for Investment Tax Credit (ITC) adders under the Inflation Reduction Act (IRA) is weak, which directly impacts project economics.

  • Opportunity Zone: The site is

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.