⚡ 40 MILLBURY RD

Worcester County, MA — Intake Report
📍 42.1467663, -71.853093 📐 12.58 acres 🏷️ APN: 226 16_D03 🔌 38cc5e9a-3437-4974-ba4f-eb0a6dceb1f6 📅 Generated July 07, 2026 06:33 PM 🆔 MA001367
BESS Score: /10 Buildable: ac Nearest Sub: North Oxford (2.7 mi) Zoning: Vacant Land - Private Preserve, Open Space-Vacant Land (Forest L
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

EAMES, D EDWIN
12.58
226 16_D03
Vacant Land - Private Preserve, Open Space-Vacant Land (Forest L (R1)
Battery Energy Storage
Worcester County
25027
-

⚡ Infrastructure

38cc5e9a-3437-4974-ba4f-eb0a6dceb1f6
13.2 kV
North Oxford
2.7 mi
115 kV kV
345kV at 0.9 mi (FITCHBURG GAS AND ELECTRIC LIGHT COMPANY)
632 ft
Not prime farmland
🔴 99 structures within 0.5 mi (setback/opposition risk)
Public
POI Onsite
OK

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
None within ~2 miles

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Oxford
Town
Oxford

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

Road Access: The property has frontage on Millbury Road, a public, two-lane road. Initial desktop review suggests it is a paved, local road capable of handling standard construction traffic. However, a detailed route survey is required to evaluate its suitability for oversized and overweight loads, such as a main power transformer (MPT) and prefabricated battery enclosures. Key areas of concern for evaluation include turning radii at intersections leading to the site, bridge weight limits, and overhead line clearances.

Topography & Site Conditions: Located in Worcester County and zoned as "Forest Land," the site's topography is likely characterized by rolling hills, moderate slopes, and potentially rocky soil, which is common in Central Massachusetts. The 12.58-acre parcel will require significant tree clearing and grading to create a level pad for the BESS compound, switchgear, and access roads. The "Buildability: OK" flag is noted but requires substantiation through a formal geotechnical investigation to assess soil bearing capacity and identify any potential ledge or unsuitable soils that could increase foundation costs.

Heavy Equipment Feasibility: Access for heavy equipment is feasible from a macro perspective via Millbury Road. The primary challenge will be the on-site work. A new, robust gravel access road will need to be constructed from Millbury Road into the project area. The feasibility and cost of this road are dependent on the final BESS location within the parcel, the site's slope, and the presence of any environmental constraints like wetlands.

Easement Concerns: The "POI Onsite" data point strongly suggests an existing utility easement crosses or abuts the property. This is a significant advantage for interconnection but must be confirmed via a title search. The title search must also identify any other restrictive easements (e.g., conservation, drainage, or private access for other parcels) that could limit the placement of equipment and reduce the de facto buildable acreage.

2. Environmental Constraints

FEMA Flood Zone: The flood zone designation is listed as "Unknown." This is a critical data gap and a high-priority diligence item. An immediate review of FEMA Flood Insurance Rate Maps (FIRMs) is required. If the proposed project area falls within a Special Flood Hazard Area (e.g., Zone A or AE), development costs will increase substantially due to the need for elevated foundations and potential for enhanced stormwater management. Siting within a floodway would likely be a fatal flaw.

Wetlands: The wetlands status is "Unknown." Given the forested nature of the site in Massachusetts, there is a high probability of state or federally jurisdictional wetlands, intermittent streams, or vernal pools. Massachusetts has a stringent Wetlands Protection Act with significant buffer zone requirements (typically 100 feet). A formal wetlands delineation by a certified professional is mandatory. The presence of extensive wetlands could severely restrict the buildable area and potentially render the site unviable.

Critical Habitat / Species: The data indicates no critical habitat on site, which is a positive initial finding. This must be verified by cross-referencing the site location with the Massachusetts Natural Heritage & Endangered Species Program (NHESP) Priority Habitat maps. If the site falls within an NHESP mapped area, consultation with the agency and potential time-of-year restrictions on construction could be required.

Brownfield/Superfund Status: The site is not a brownfield. While this indicates a lower risk of soil contamination and associated cleanup liabilities, it is a disadvantage from a financial perspective. The project is ineligible for the 10% IRA Brownfield Adder, which can be critical for bolstering project returns.

Pipeline Proximity: No gas pipelines are located within the immediate vicinity, mitigating risks associated with pipeline-related setbacks, safety protocols, and potential co-location conflicts.

3. Grid Infrastructure & Interconnection

<

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.