TO: Sunland America Corp. Development Committee
FROM: Senior BESS Site Evaluation Analyst
DATE: October 26, 2023
SUBJECT: Comprehensive Site Diligence Analysis for 41A Bacon St, Westminster, MA (APN: 99_22)
This report provides a comprehensive due diligence analysis for the property located at 41A Bacon Street in Westminster, Worcester County, Massachusetts. The 5.61-acre parcel presents a compelling grid-proximity opportunity but is burdened by significant environmental unknowns and a lack of federal incentive adders. The following sections detail the site's suitability for a distribution-scale (≤5MW) Battery Energy Storage System (BESS) project.
Road Access & Equipment Delivery: The site has frontage on Bacon Street, a two-lane, paved local road. Initial desktop review suggests this road is sufficient for standard construction traffic. However, its suitability for oversized and overweight loads, such as a main power transformer or 53-foot battery containers on a low-boy trailer, Requires Verification. A route survey would be necessary to assess turning radii from major arteries like Route 2, as well as to check for any low-clearance bridges or weight-restricted roads in the vicinity. The quality of the road appears adequate, but a physical site visit is needed to confirm.
Terrain & Site Preparation: Located in Central Massachusetts, the parcel's topography is likely to be rolling to hilly, consistent with the region. The "Land Use" and "Buildability" fields are unpopulated, indicating a critical data gap. A topographical survey is essential. Significant grading could be required to create a level pad for the BESS equipment, potentially increasing civil construction costs. The current state of the parcel (wooded, cleared, etc.) is unknown and will heavily influence site preparation expenses.
Access Easements: The parcel appears to have direct frontage, but the exact location of the proposed BESS compound within the 5.61 acres is undetermined. A title search is required to confirm that no access easements are needed across neighboring properties and to ensure there are no existing utility or access easements encumbering the most logical buildable area of the site.
The environmental profile of this site is characterized by critical unknowns that represent a potential fatal flaw.