⚡ 110 PLEASANT ST

Worcester County, MA — Intake Report
📍 42.5818178, -71.7707511 📐 7.02 acres 🏷️ APN: 162 095.0_0016_0000.0 🔌 📅 Generated June 29, 2026 12:18 PM 🆔 MA000772
BESS Score: /10 Buildable: ac Nearest Sub: PLEASANT STREET (0.1 mi) Zoning: Commercial (Retail) - Commercial Building, Mail Order, Show Room
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

110 PLEASANT STREET LLC
7.02
162 095.0_0016_0000.0
Commercial (Retail) - Commercial Building, Mail Order, Show Room (C)
Worcester County
25027
-

⚡ Infrastructure

PLEASANT STREET
0.1 mi
-999999 kV
115kV at 3.5 mi (FITCHBURG GAS AND ELECTRIC LIGHT COMPANY)
388 ft
Not prime farmland
🔴 370 structures within 0.5 mi (setback/opposition risk)

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
34 site(s) within ~2 mi

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Lunenburg

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

The subject property, located at 110 Pleasant Street, benefits from direct frontage on a named public road. Pleasant Street appears to be a local, two-lane paved road. Initial evaluation suggests that standard construction vehicle access is feasible. However, the critical path for equipment delivery involves oversized and overweight transport for the main power transformer and battery container units.

  • Road Access Quality: Access appears adequate for initial diligence. Actionable Insight: A physical site visit and desktop route survey are required to verify road width, turning radii from major highways, and the absence of low-clearance bridges or weight-restricted infrastructure between the nearest interstate and the site.
  • Terrain Characteristics: While a topographic survey has not been performed, the property's current "Commercial" land use suggests it is likely cleared and relatively flat, especially the portions previously developed or intended for development. Worcester County generally features rolling hills, so some grading may be necessary, but significant earthwork is not anticipated. This is a positive indicator for minimizing civil construction costs.
  • Heavy Equipment Feasibility: Feasibility is considered high due to the direct road frontage. The primary constraint will be the load-bearing capacity of Pleasant Street itself and any potential culverts or small bridges along the final approach. Coordination with the Lunenburg Department of Public Works will be necessary.
  • Easement Concerns: Requires Verification. A title report must be commissioned to identify any existing utility easements (for the adjacent substation feeder lines, for example), access easements for other parcels, or other encumbrances that could restrict the placement of BESS equipment and reduce the net buildable area.

2. Environmental Constraints

The environmental profile of this site presents both significant risks and a potential, albeit uncertain, opportunity. The high number of nearby contaminated sites warrants a cautious and thorough approach.

  • FEMA Flood Zone: Critical Data Gap. The flood zone designation is unknown. Verification via FEMA's Flood Insurance Rate Maps (FIRMs) is an immediate next step. If the site falls within a Special Flood Hazard Area (e.g., Zone A or AE), development costs will increase substantially due to the need for elevated foundations for all equipment, and permitting may become more complex. A location within a floodway would likely be a fatal flaw.
  • Wetlands Presence: Critical Data Gap. The presence of state or federally regulated wetlands is unknown. Massachusetts has stringent wetlands protection laws, including the Wetlands Protection Act, which mandates a 100-foot buffer zone from delineated wetland resources. The 7.02-acre parcel could be significantly constrained if wetlands are present, potentially making a 5MW BESS layout infeasible. A formal wetlands delineation is a critical-path due diligence item.
  • Critical Habitat / Endangered Species: The initial screen shows no critical habitat, which is a significant positive. However, a formal request to the US Fish & Wildlife Service (IPaC tool) and the Massachusetts Natural Heritage & Endangered Species Program (NHESP) is required to confirm no state-listed species or sensitive habitats are on or near the parcel.
  • Brownfield/Superfund Status: The presence of 34 contaminated sites within a 2-mile radius is a major red flag. This increases the risk that the subject parcel itself may have historical contamination. A Phase I Environmental Site Assessment (ESA) is non-negotiable. Conversely, if the site itself can be officially designated as a "brownfield" under federal definitions (e.g., through a Phase II ESA confirming contamination), it could qualify for the 10% Brownfield ITC adder, a significant economic benefit. This is a high-risk, high-reward scenario.
  • Pipeline Proximity: No gas transmission pipelines are located nearby, eliminating risks associated with pipeline easements, setbacks, and safety protocols. This is a notable positive.

3. Grid Infrastructure & Interconnection

The site's primary strength lies in its exceptional proximity to existing grid infrastructure. This is the most compelling attribute of the property.

  • Nearest Substation: The PLEASANT STREET substation is located just 0.1 miles from the parcel. This is an ideal distance, drastically reducing the cost and complexity of the generator tie-line (gen-tie). Trenching or boring under Pleasant Street will likely be the primary construction activity.
  • Voltage & Capacity: Critical Data Gap. The substation voltage is listed as an error (-999999 kV). Given its name and location, it is almost certainly a distribution-level substation. The most likely voltage class in this region is 13.8 kV. The available capacity on the feeder and in the substation is the single most important technical unknown. A

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.