⚡ 1480 RENAISSANCE DR

Cook County, IL — Intake Report
📍 42.0336601, -87.8646427 📐 35.02 acres 🏷️ APN: 9221100050000 🔌 6fb54528-966c-4764-bda6-1e20dc045eb5 📅 Generated July 07, 2026 01:38 PM 🆔 IL001590
BESS Score: /10 Buildable: ac Nearest Sub: - (-) Zoning: Commercial (Office) - Office Bldg (Multi-Story)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

IMPERIAL REALTY CO -
35.02
9221100050000
Commercial (Office) - Office Bldg (Multi-Story) (-)
Battery Energy Storage
Cook County
17031

⚡ Infrastructure

6fb54528-966c-4764-bda6-1e20dc045eb5
-
-
- kV
138kV at 1.5 mi (COMMONWEALTH EDISON CO)
633 ft
Not prime farmland
🔴 941 structures within 0.5 mi (setback/opposition risk)
Public

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
Yes — Fossil Fuel Employment (FFE Area)
No

🏛️ Jurisdiction

Park Ridge
City
Park Ridge

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

TO: Sunland America Corp. Development Committee

FROM: Senior BESS Site Evaluation Analyst

DATE: October 26, 2023

SUBJECT: Comprehensive Site Diligence Analysis for "Project Renaissance"

PROPERTY: 1480 RENAISSANCE DR, Park Ridge, Cook County, IL (APN: 09221100050000)


1. Site Access & Topography

Road Access: The site benefits from excellent public road access. It is located in a modern office park just off South Dee Road, a major local arterial, and is less than a mile from the I-294 (Tri-State Tollway) interchange. The roads are wide, paved, and appear to be in good condition, designed to accommodate commercial traffic. This significantly de-risks the logistics of equipment delivery.

Topography & Equipment Feasibility: Based on aerial imagery and the general geography of the Chicago metropolitan area, the site is presumed to be flat with minimal grade. This is ideal for BESS development, as it will minimize civil engineering and site preparation costs. The robust road network leading directly to the parcel ensures that heavy equipment, including mobile cranes for setting transformers and switchgear, and flatbed trucks delivering battery containers and inverters, can access the site with no anticipated issues.

Easement Concerns: While road access to the parcel boundary is public, the property is situated within a planned office park development. It is highly probable that the property is encumbered by various easements (e.g., utility, access, drainage, shared parking) and potentially Covenants, Conditions, and Restrictions (CC&Rs) that could constrain the usable development area. A full title report and ALTA survey are required to identify and map these encumbrances.

A notable data discrepancy exists regarding parcel size: the master data indicates 35.02 acres, while Regrid data shows 2.97 acres for this APN. The 2.97-acre figure is more consistent with the visual boundaries of an office building lot and is assumed to be correct for this analysis. This must be verified immediately.

2. Environmental Constraints

FEMA Flood Zone: The FEMA flood zone designation is currently Unknown. This is a critical data gap. Any designation within a 100-year floodplain (e.g., Zone A, AE) would introduce significant design challenges and costs, potentially requiring all equipment pads to be elevated above the Base Flood Elevation, or could render the site undevelopable. A FEMA FIRMette review is a high-priority next step.

Wetlands: The presence of jurisdictional wetlands is Unknown. A desktop screening using the National Wetlands Inventory (NWI) is required. Given the developed nature of the surrounding area, the risk of significant wetlands is likely low, but any identified wetlands would trigger setback requirements (typically 50-100 feet) and reduce the buildable acreage.

Habitat & Species: The data indicates no designated Critical Habitat on site, which is a positive. The urbanized setting makes the presence of endangered species unlikely, but a standard review of the USFWS IPaC database for Cook County is recommended as a final check.

Brownfield/Superfund Status: There is one Superfund/Brownfield site located within two miles of the parcel. This is not a direct contamination risk to the property itself but presents a significant opportunity. The site's location near a brownfield may qualify it for the 10% IRA Brownfield tax credit adder. Verification is required to confirm the project's census tract is designated as a brownfield tract per IRA guidance. This is a potential financial advantage.

Pipeline Proximity: No major gas transmission pipelines are identified within a three-mile radius. This is a significant safety and layout advantage, eliminating concerns related to pipeline setbacks and potential co-location risks.

3. Grid Infrastructure & Interconnection

Substation & Feeder: The nearest substation is not identified in the provided data, which is a major project unknown. However, a preliminary desktop review identifies the ComEd "Park Ridge Substation" approximately 0.5 miles northeast of the site. This proximity is highly favorable

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.