⚡ 1480 RENAISSANCE DR

Cook County, IL — Intake Report
📍 42.0336601, -87.8646427 📐 35.02 acres 🏷️ APN: 9221100050000 🔌 6fb54528-966c-4764-bda6-1e20dc045eb5 📅 Generated July 06, 2026 03:53 PM 🆔 IL001590
BESS Score: /10 Buildable: ac Nearest Sub: - (-) Zoning: Commercial (Office) - Office Bldg (Multi-Story)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

IMPERIAL REALTY CO -
35.02
9221100050000
Commercial (Office) - Office Bldg (Multi-Story) (-)
Battery Energy Storage
Cook County
17031

⚡ Infrastructure

6fb54528-966c-4764-bda6-1e20dc045eb5
-
-
- kV
138kV at 1.5 mi (COMMONWEALTH EDISON CO)
633 ft
Not prime farmland
🔴 941 structures within 0.5 mi (setback/opposition risk)
Public

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
Yes — Fossil Fuel Employment (FFE Area)
No

🏛️ Jurisdiction

Park Ridge
City
Park Ridge

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

MEMORANDUM

TO: Sunland America Corp. Development Committee

FROM: Senior BESS Site Evaluation Analyst

DATE: October 26, 2023

SUBJECT: Comprehensive Site Diligence Analysis for 1480 Renaissance Dr, Park Ridge, IL (APN: 09221100050000)


This report provides a comprehensive due diligence analysis for a potential distribution-scale Battery Energy Storage System (BESS) project at the subject property. The analysis covers key development pillars including site characteristics, environmental constraints, grid infrastructure, regulatory hurdles, and financial incentives under the Inflation Reduction Act (IRA).

1. Site Access & Topography

Road Access & Equipment Delivery: The site has excellent access. It is located in a modern office park with direct frontage on Renaissance Drive, a well-maintained public road. Its proximity to the I-294 Tollway facilitates straightforward logistics for the delivery of heavy equipment. The local road network appears robust and capable of handling oversized loads such as transformers, switchgear, and containerized battery systems. A detailed route survey will be required prior to delivery, but initial assessment is highly favorable.

Terrain & Buildability: The Chicago metropolitan area, including Park Ridge, is characterized by flat topography. This is a significant advantage, as it will likely minimize earthwork and civil engineering costs. We assume the site is relatively level, but this Requires Verification with a formal topographic survey. The primary buildability concern is a notable discrepancy in parcel size between data sources (35 acres vs. 2.97 acres). Assuming the 2.97-acre figure from Regrid is accurate, this is still a suitable footprint for a ≤5MW BESS project, allowing for necessary equipment spacing and setbacks.

Heavy Equipment & Easements: Access for cranes and delivery vehicles onto the parcel itself appears feasible from Renaissance Drive. However, a title search is a critical next step to identify any existing utility easements (power, water, sewer, data) or access restrictions that could encumber the property and constrain the final site layout. The current use as an office building suggests the presence of significant underground utilities.

2. Environmental Constraints

Flood & Wetlands: The FEMA flood zone and wetlands status are currently Unknown. This represents a significant environmental risk. A desktop review of FEMA Flood Insurance Rate Maps (FIRMs) and the National Wetlands Inventory (NWI) is an immediate priority. If the site is within a Special Flood Hazard Area (e.g., Zone AE), all equipment would need to be elevated above the Base Flood Elevation, adding substantial cost. The presence of jurisdictional wetlands could create prohibitive setbacks, severely reducing the buildable area or rendering the site unusable.

Habitat & Protected

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.