⚡ 1480 RENAISSANCE DR

Cook County, IL — Intake Report
📍 42.0336601, -87.8646427 📐 35.02 acres 🏷️ APN: 9221100050000 🔌 6fb54528-966c-4764-bda6-1e20dc045eb5 📅 Generated July 03, 2026 02:35 PM 🆔 IL001590
BESS Score: /10 Buildable: ac Nearest Sub: - (-) Zoning: Commercial (Office) - Office Bldg (Multi-Story)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

IMPERIAL REALTY CO -
35.02
9221100050000
Commercial (Office) - Office Bldg (Multi-Story) (-)
Battery Energy Storage
Cook County
17031

⚡ Infrastructure

6fb54528-966c-4764-bda6-1e20dc045eb5
-
-
- kV
138kV at 1.5 mi (COMMONWEALTH EDISON CO)
633 ft
Not prime farmland
🔴 941 structures within 0.5 mi (setback/opposition risk)
Public

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
Yes — Fossil Fuel Employment (FFE Area)
No

🏛️ Jurisdiction

Park Ridge
City
Park Ridge

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

MEMORANDUM

TO: Sunland America Corp. Development Committee

FROM: Senior BESS Site Evaluation Analyst

DATE: October 26, 2023

SUBJECT: Comprehensive Site Diligence Analysis for "Project Renaissance"

PROPERTY: 1480 RENAISSANCE DR, Park Ridge, Cook County, IL (APN: 09221100050000)


This report provides a comprehensive due diligence analysis for the potential development of a distribution-scale Battery Energy Storage System (BESS) at the subject property. The analysis identifies key opportunities, constraints, risks, and recommended next steps to determine project viability.

1. Site Access & Topography

Road Access & Equipment Delivery: The site exhibits excellent logistical characteristics. Located in a modern commercial office park in Park Ridge, a developed Chicago suburb, it has direct access from Renaissance Drive, a well-maintained public road. This road connects to major arterial routes and is situated immediately adjacent to Interstate 294 (Tri-State Tollway), providing an ideal corridor for heavy freight.

Equipment Feasibility: Delivery of large, heavy equipment such as multi-ton transformers, power conversion systems (PCS), and containerized battery enclosures is anticipated to be straightforward. The existing road network is designed for commercial truck traffic, and there are no apparent low-clearance bridges, tight turning radii, or weight-restricted roads that would impede access. The site itself appears to be a large, paved parking lot associated with an office building, offering ample staging area for construction.

Topography & Site Prep: As is typical for the Chicagoland area, the terrain is presumed to be exceptionally flat. This is a significant advantage, as it will minimize the need for extensive civil work and grading, thereby reducing construction costs and timelines. The existing paved surface could potentially be utilized or will be straightforward to remove for foundation work.

Easement Concerns: Requires Verification. As an established commercial parcel, it is highly probable that multiple utility and access easements already encumber the property. A full ALTA survey and title report are required to identify the location and nature of any easements for power, water, sewer, and telecommunications, which could constrain the final BESS layout.

2. Environmental Constraints

FEMA Flood Zone: The FEMA flood zone designation is currently Unknown. This is a critical data gap. A review of FEMA's Flood Insurance Rate Maps (FIRMs) is an immediate next step. If the site is located within a 100-year floodplain (e.g., Zone A or AE), development costs will increase due to the need for elevated foundations, or the site may be rendered undevelopable.

Wetlands: The presence of jurisdictional wetlands is Unknown. A desktop screening using the National Wetlands Inventory (NWI) is necessary. Given the developed nature of the site (office park), the risk is likely low, but any identified wetlands would trigger significant setback requirements (typically 50-100 feet) and reduce the buildable acreage.

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.