⚡ 1480 RENAISSANCE DR

Cook County, IL — Intake Report
📍 42.0336601, -87.8646427 📐 35.02 acres 🏷️ APN: 9221100050000 🔌 6fb54528-966c-4764-bda6-1e20dc045eb5 📅 Generated July 03, 2026 09:18 AM 🆔 IL001590
BESS Score: /10 Buildable: ac Nearest Sub: - (-) Zoning: Commercial (Office) - Office Bldg (Multi-Story)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

IMPERIAL REALTY CO -
35.02
9221100050000
Commercial (Office) - Office Bldg (Multi-Story) (-)
Battery Energy Storage
Cook County
17031

⚡ Infrastructure

6fb54528-966c-4764-bda6-1e20dc045eb5
-
-
- kV
138kV at 1.5 mi (COMMONWEALTH EDISON CO)
633 ft
Not prime farmland
🔴 941 structures within 0.5 mi (setback/opposition risk)
Public

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
Yes — Fossil Fuel Employment (FFE Area)
No

🏛️ Jurisdiction

Park Ridge
City
Park Ridge

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

MEMORANDUM

TO: Sunland America Corp. Development Committee
FROM: Senior BESS Site Evaluation Analyst
DATE: October 26, 2023
SUBJECT: Comprehensive Site Diligence Analysis for "Project Renaissance"
PROPERTY: 1480 RENAISSANCE DR, Park Ridge, Cook County, IL (APN: 09221100050000)


This report provides a comprehensive due diligence analysis for the potential development of a distribution-scale (≤5MW) Battery Energy Storage System (BESS) at the subject property. The analysis identifies significant regulatory and interconnection challenges that present substantial risks to project viability.

1. Site Access & Topography

The subject property is located within a modern commercial office park, fronting Renaissance Drive. Road access is a key strength of this site.

  • Road Access & Equipment Delivery: Access is provided via public, paved, commercial-grade roads (Renaissance Dr. off W. Higgins Rd.), which are designed to handle heavy truck traffic. Delivery of large, heavy equipment, including battery containers, medium-voltage transformers, and construction cranes, appears highly feasible. The proximity to Interstate 294 is also advantageous for logistics.
  • Terrain Characteristics: As is typical for the Chicago metropolitan area, the site is expected to be flat with minimal grade. This topography is ideal for BESS development, as it will significantly reduce the need for extensive civil work and site grading, lowering overall construction costs.
  • Heavy Equipment Access: Direct access from the public road onto the parcel appears straightforward. However, an ALTA survey is required to confirm turning radii and ensure no physical impediments (e.g., curbs, light poles, landscaping) would obstruct the delivery path for oversized loads.
  • Easement Concerns: While direct access is public, the parcel is in a developed area. It is highly probable that existing utility easements (power, water, sewer, communications) cross the property. A preliminary title report is essential to identify these easements, as they may constrain the buildable area and dictate the final site layout.

2. Environmental Constraints

The environmental profile presents several critical unknowns that must be resolved. While no immediate fatal flaws are apparent from the initial data, significant risks exist.

  • FEMA Flood Zone: The flood zone designation is Unknown. This is a critical data gap. The property is located approximately 1.5 miles east of the Des Plaines River. A review of FEMA Flood Insurance Rate Maps (FIRMs) is a top priority. If the site is located within a 100-year floodplain (e.g., Zone AE), development costs would increase substantially due to the need for elevated foundations, and permitting could become impossible.
  • Wetlands: The presence of jurisdictional wetlands is Unknown. A desktop screening using the National Wetlands Inventory (NWI) is the first step. Given the developed nature of the office park, naturally occurring wetlands are less likely, but engineered stormwater management features (detention ponds, swales) could be present and may be classified as jurisdictional waters, requiring setbacks.
  • Critical Habitat / Endangered Species: The data indicates no critical habitat or protected areas on site, which is a positive. We must still run a US Fish & Wildlife Service IPaC report to screen for the potential presence of federally listed species, such as the Northern Long-Eared Bat, whose habitat could be impacted by any necessary tree clearing.
  • Brownfield/Superfund Status: There is one Superfund site within two miles

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.