⚡ 1480 RENAISSANCE DR

Cook County, IL — Intake Report
📍 42.0336601, -87.8646427 📐 35.02 acres 🏷️ APN: 9221100050000 🔌 6fb54528-966c-4764-bda6-1e20dc045eb5 📅 Generated July 02, 2026 01:28 PM 🆔 IL001590
BESS Score: /10 Buildable: ac Nearest Sub: - (-) Zoning: Commercial (Office) - Office Bldg (Multi-Story)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

IMPERIAL REALTY CO -
35.02
9221100050000
Commercial (Office) - Office Bldg (Multi-Story) (-)
Battery Energy Storage
Cook County
17031

⚡ Infrastructure

6fb54528-966c-4764-bda6-1e20dc045eb5
-
-
- kV
138kV at 1.5 mi (COMMONWEALTH EDISON CO)
633 ft
Not prime farmland
🔴 941 structures within 0.5 mi (setback/opposition risk)
Public

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
Yes — Fossil Fuel Employment (FFE Area)
No

🏛️ Jurisdiction

Park Ridge
City
Park Ridge

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

MEMORANDUM

TO: Sunland America Corp. Development Committee

FROM: Senior BESS Site Evaluation Analyst

DATE: October 26, 2023

SUBJECT: Comprehensive Site Diligence Analysis for "Project Renaissance"

PROPERTY: 1480 RENAISSANCE DR, Park Ridge, Cook County, IL (APN: 09221100050000)

RECOMMENDATION: MAYBE

This report provides a comprehensive diligence analysis for the potential acquisition and development of a distribution-scale (≤5MW) Battery Energy Storage System (BESS) at the subject property. The site benefits from a key federal incentive and strong physical characteristics. However, it faces significant and potentially fatal flaws related to grid interconnection availability and local zoning entitlement. The current recommendation is MAYBE, pending the immediate investigation of the critical risks outlined below.

1. Site Access & Topography

Road Access: The property has excellent access. It is located in a modern commercial office park directly off Renaissance Drive, a paved public road. Its proximity to major thoroughfares like I-294 suggests that the local road network is well-maintained and built to a high standard, capable of handling heavy vehicle traffic.

Terrain & Equipment Feasibility: As is typical for the Chicago metropolitan area, the site's topography is expected to be flat. The existing development as an office building confirms the site is already graded, which will significantly reduce civil construction costs. Access for heavy equipment, including cranes for setting transformers and switchgear, and flatbed trucks for delivering BESS containers, appears feasible. A detailed swept-path analysis is recommended to confirm turning radii within the office park's internal roads to the specific project footprint.

Easement Concerns: As part of a larger commercial development, the parcel is almost certainly encumbered by existing access, utility, and drainage easements. A full title report and ALTA survey are required to identify these easements and ensure they do not conflict with the proposed BESS equipment layout. New easements for interconnection and access will also need to be secured.

2. Environmental Constraints

Flood & Wetlands: The FEMA flood zone and wetlands status are currently Unknown. This represents a critical data gap. Any designation within a 100-year floodplain (e.g., Zone AE) would require elevating all equipment above the Base Flood Elevation, adding significant cost and complexity. The presence of jurisdictional wetlands would trigger setback requirements (typically 50-10

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.