⚡ 1480 RENAISSANCE DR

Cook County, IL — Intake Report
📍 42.0336601, -87.8646427 📐 35.02 acres 🏷️ APN: 9221100050000 🔌 6fb54528-966c-4764-bda6-1e20dc045eb5 📅 Generated June 30, 2026 05:52 PM 🆔 IL001590
BESS Score: /10 Buildable: ac Nearest Sub: - (-) Zoning: Commercial (Office) - Office Bldg (Multi-Story)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

IMPERIAL REALTY CO -
35.02
9221100050000
Commercial (Office) - Office Bldg (Multi-Story) (-)
Battery Energy Storage
Cook County
17031

⚡ Infrastructure

6fb54528-966c-4764-bda6-1e20dc045eb5
-
-
- kV
138kV at 1.5 mi (COMMONWEALTH EDISON CO)
633 ft
Not prime farmland
🔴 941 structures within 0.5 mi (setback/opposition risk)
Public

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
No
No

🏛️ Jurisdiction

Park Ridge
City
Park Ridge

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

The subject property at 1480 Renaissance Dr, located in a developed commercial park in Park Ridge, IL, benefits from excellent existing infrastructure. Access is provided via Renaissance Drive, a paved public road capable of supporting standard commercial traffic. Initial evaluation suggests that delivery of heavy equipment, including multi-ton transformers and containerized battery systems (e.g., Tesla Megapacks or similar), is feasible. The established road network in this suburban area is designed for tractor-trailer access to existing office buildings. However, a detailed route survey is recommended to verify turning radii, bridge weight limits, and any overhead line clearance issues between the nearest interstate (I-294) and the site.

Based on the location in Cook County, the site's topography is presumed to be relatively flat, which is highly advantageous for BESS development as it minimizes civil engineering and grading costs. This requires verification with a formal topographic survey. The primary concern regarding access is not the public right-of-way, but rather potential on-site constraints. As an existing commercial lot, there will be established curb cuts, parking lots, and landscaping. The project plan must accommodate these features or budget for their removal and restoration. A title search is critical to identify any existing access or utility easements that may encumber the property and restrict the placement of BESS equipment. The parcel size discrepancy between the listed 35.02 acres and the Regrid APN data of 2.97 acres is a major red flag that must be resolved immediately via a title report and survey to confirm the actual developable area.

2. Environmental Constraints

The environmental profile of this site contains significant unknowns that present material risk. The FEMA Flood Zone designation is Unknown. This is a critical data gap; if the site is located within a 100-year floodplain (Zone AE) or a 500-year floodplain (Zone X-500), it could trigger extensive civil work requirements (e.g., building up a pad for all equipment) or render the site undevelopable. Similarly, the presence of Wetlands is Unknown. A desktop screening using the National Wetlands Inventory (NWI) is an immediate next step, to be followed by a formal wetland delineation by a qualified consultant if any risk is identified. Any jurisdictional wetlands would entail significant setbacks and reduce the buildable acreage.

On a positive note, the site is not within a designated critical habitat or protected area, and there are no pipelines within a three-mile radius, mitigating two common development risks. The presence of one Superfund/brownfield site within two miles is a moderate concern. While not on the subject property itself, it could indicate area-wide soil or groundwater contamination. A Phase I Environmental Site Assessment (ESA) is strongly recommended to assess this risk. Because the site itself is not a designated brownfield, it is not eligible for the 10% IRA brownfield tax credit adder. This nearby site represents a potential liability rather than a financial advantage. The property is not located in Maryland, so the Chesapeake Bay Critical Area regulations are not applicable.

3. Grid Infrastructure & Interconnection

Grid access is the most significant challenge and a potential fatal flaw for this site. The provided data shows a complete lack of information on the nearest distribution substation (distance, voltage, capacity). For a distribution-scale project (≤5MW), a direct connection to a nearby distribution feeder (typically 12.47kV or 34.5kV in ComEd territory) is the only economically viable path. Without an identified feeder with sufficient capacity, the project is not feasible.

The nearest identified grid asset is a 138kV transmission line owned by Commonwealth Edison (ComEd) located 1.5 miles away. Interconnecting at the transmission level for a small 5MW project is financially prohibitive. The cost for a new 1.5-mile transmission line extension and a dedicated substation would likely exceed $5-10 million, making the project uneconomical. Therefore, the recommended interconnection voltage must be at the distribution level.

Actionable Insight: The immediate priority is to commission a desktop grid screening to identify the nearest ComEd distribution feeder and substation. Assuming a viable feeder is found within 0.5 miles, interconnection costs could range from $750,000 to $2,000,000, depending on whether the line is overhead or underground and the extent of utility upgrades required. The ComEd interconnection queue, governed by the Illinois Commerce Commission, is known to be congested, with timelines from application to commercial operation often spanning 24-36 months. The likely feeder configuration would be a 3-phase overhead or underground line serving the commercial park, but its capacity is a critical unknown.

4. Regulatory & Zoning Analysis

The Authority Having Jurisdiction (AHJ) is the City of Park Ridge. The parcel's current zoning is 'O' - Office District, which is

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.