⚡ 1480 RENAISSANCE DR

Cook County, IL — Intake Report
📍 42.0336601, -87.8646427 📐 35.02 acres 🏷️ APN: 9221100050000 🔌 6fb54528-966c-4764-bda6-1e20dc045eb5 📅 Generated June 29, 2026 11:08 AM 🆔 IL001590
BESS Score: /10 Buildable: ac Nearest Sub: - (-) Zoning: Commercial (Office) - Office Bldg (Multi-Story)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

IMPERIAL REALTY CO -
35.02
9221100050000
Commercial (Office) - Office Bldg (Multi-Story) (-)
Battery Energy Storage
Cook County
17031

⚡ Infrastructure

6fb54528-966c-4764-bda6-1e20dc045eb5
-
-
- kV
138kV at 1.5 mi (COMMONWEALTH EDISON CO)
633 ft
Not prime farmland
🔴 941 structures within 0.5 mi (setback/opposition risk)
Public

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
Yes — Fossil Fuel Employment (FFE Area)
No

🏛️ Jurisdiction

Park Ridge
City
Park Ridge

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

MEMORANDUM

TO: Sunland America Corp. Investment Committee
FROM: Senior BESS Site Evaluation Analyst
DATE: October 26, 2023
SUBJECT: Comprehensive Site Diligence Analysis for "Project Renaissance"
PROPERTY: 1480 RENAISSANCE DR, Park Ridge, Cook County, IL (APN: 09221100050000)


1. Site Access & Topography

The subject property benefits from excellent physical access. Located in a developed commercial office park in Park Ridge, it is served by public, paved roads capable of handling heavy commercial traffic. Delivery of large-scale BESS equipment, including 40-foot battery containers, multi-ton transformers, and inverter skids, appears highly feasible. A detailed route survey is recommended to confirm the absence of any low-clearance bridges or weight-restricted roads on the final approach, but this is considered a low risk.

Based on the location within the greater Chicago metropolitan area, the site's topography is presumed to be flat to gently sloping. This is highly advantageous, as it will significantly minimize civil engineering and grading costs, which can be substantial on more challenging terrain. The primary buildability concern is not topography, but the existing improvements on the parcel (an office building and associated parking).

Access easements will be a key diligence item. While the site has public road frontage, an easement will be required to construct and maintain the interconnection line to the Point of Interconnection (POI). The path and cost of this easement are currently unknown. Existing utility easements for power, water, and communications are certainly present and must be identified through a title report and ALTA survey to avoid conflicts with the proposed BESS layout.

2. Environmental Constraints

Environmental factors present a mix of moderate risks and a significant potential opportunity. The following constraints must be investigated:

  • FEMA Flood Zone: Status is Requires Verification. Siting within a 100-year floodplain (e.g., Zone AE) would introduce significant design complexity and cost, requiring all equipment pads to be elevated above the Base Flood Elevation. A location within a designated floodway would likely be a fatal flaw. This must be the first environmental screen performed.
  • Wetlands: Status is Requires Verification

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.