⚡ 1480 RENAISSANCE DR

Cook County, IL — Intake Report
📍 42.0336601, -87.8646427 📐 35.02 acres 🏷️ APN: 9221100050000 🔌 6fb54528-966c-4764-bda6-1e20dc045eb5 📅 Generated June 28, 2026 02:30 PM 🆔 IL001590
BESS Score: /10 Buildable: ac Nearest Sub: - (-) Zoning: Commercial (Office) - Office Bldg (Multi-Story)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

IMPERIAL REALTY CO -
35.02
9221100050000
Commercial (Office) - Office Bldg (Multi-Story) (-)
Battery Energy Storage
Cook County
17031

⚡ Infrastructure

6fb54528-966c-4764-bda6-1e20dc045eb5
-
-
- kV
138kV at 1.5 mi (COMMONWEALTH EDISON CO)
Query failed
Not prime farmland
🔴 941 structures within 0.5 mi (setback/opposition risk)
Public

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
Yes — Fossil Fuel Employment (FFE Area)
No

🏛️ Jurisdiction

Park Ridge
City
Park Ridge

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

MEMORANDUM

TO: Sunland America Corp. Development Committee

FROM: Senior BESS Site Evaluation Analyst

DATE: October 26, 2023

SUBJECT: Comprehensive Site Diligence Analysis for "Project Renaissance"

PROPERTY: 1480 RENAISSANCE DR, Park Ridge, Cook County, IL (APN: 09221100050000)


This report provides a comprehensive due diligence analysis for the potential acquisition and development of a distribution-scale Battery Energy Storage System (BESS) at the subject property. The analysis identifies key site attributes, risks, and recommended next steps to determine project viability.

1. Site Access & Topography

Road Access & Feasibility: The site benefits from excellent public road access. It is located in a well-developed commercial office park directly off Renaissance Drive, a multi-lane, paved road. This road connects to major thoroughfares and is less than a mile from Interstate 294, providing a direct and high-quality route for equipment delivery.

Terrain Characteristics: As is typical for the Chicago metropolitan area, the site and surrounding topography are exceptionally flat. This is a significant advantage, as it will minimize civil engineering costs associated with grading and site preparation. No significant topographical challenges are anticipated.

Heavy Equipment Access: The existing high-quality road infrastructure and flat terrain are well-suited for the delivery of heavy equipment, including large semi-trucks carrying battery containers, pad-mount transformers, and switchgear. A detailed route survey will be required to confirm the absence of any low-clearance bridges or road weight restrictions between the interstate and the site, but access is presumed to be straightforward.

Easement Concerns: As a developed commercial parcel, the property is likely encumbered by existing utility easements (power, water, sewer, communications). A title commitment and ALTA survey are required to identify the location and scope of these easements, as they will directly impact the final buildable area. Access to the public right-of-way appears secure and is not a primary concern.

2. Environmental Constraints

FEMA Flood Zone: The FEMA flood zone designation is currently Unknown. This is a critical data gap. If the site is located within a 100-year floodplain (e.g., Zone AE), development costs could increase substantially due to the need for elevated foundations for all equipment, or the site could be rendered undevelopable. Action: A FEMA FIRMette must be pulled immediately to verify the flood risk.

Wetlands: The presence of jurisdictional wetlands is Unknown. The presence of wetlands would trigger significant setback requirements (typically 50-100 feet) and a lengthy, expensive permitting process through the Army Corps of Engineers. Action: A desktop screening using the National Wetlands Inventory (NWI) is an immediate next step, to be followed by a formal wetlands delineation if the screening indicates a potential presence.

Critical Habitat / Endangered Species: The data indicates no critical habitats or protected areas on or near the site. This is a positive finding that significantly de-risks the environmental permitting pathway.

Brownfield/Superfund Status: While there is a Superfund site within two miles, the subject parcel itself is not listed. This proximity does not automatically qualify the site for the IRA brownfield bonus. To qualify for the 10% ITC adder, the project site itself must meet the definition of a brownfield under 42 U.S.C. § 9601(39). Advantage/Action: A Phase I Environmental Site Assessment (ESA) is required to investigate the site's historical use. If contamination or prior industrial use is identified, it could unlock this valuable 10% tax credit adder, turning a potential liability into a financial advantage.

Pipeline Proximity: The site has no major gas or hazardous liquid pipelines within a three-mile radius. This is a significant safety and layout advantage, eliminating concerns related to pipeline setbacks and explosion risk.

3. Grid Infrastructure & Interconnection

📸 Satellite Inspection