⚡ 1480 RENAISSANCE DR

Cook County, IL — Intake Report
📍 42.0336601, -87.8646427 📐 35.02 acres 🏷️ APN: 9221100050000 🔌 6fb54528-966c-4764-bda6-1e20dc045eb5 📅 Generated June 27, 2026 06:44 AM 🆔 IL001590
BESS Score: /10 Buildable: ac Nearest Sub: - (-) Zoning: Commercial (Office) - Office Bldg (Multi-Story)
🗺️ Map
📐 Site Layout
📋 Overview
🤖 AI Analysis
📝 Notes

🔍 Site Diligence

Complete these items. Changes save automatically.
AHJ Confirmed
Verify governing jurisdiction via municipality overlay
Zoning Verified
Confirm BESS-compatible zoning or CUP/SUP pathway
Flood/Wetlands Clear
FEMA Zone X or buildable area avoids flood/wetlands
Site Access Confirmed
Road access, easements, equipment delivery route
Substation Feasibility
Nearest substation capacity and voltage suitable
Setback Analysis
Buildable acreage accounts for required setbacks
Environmental Clear
No endangered species, conservation areas, brownfield issues
Title Clear
No liens, encumbrances, or easement conflicts

📝 Diligence Fields

🏠 Property Details

IMPERIAL REALTY CO -
35.02
9221100050000
Commercial (Office) - Office Bldg (Multi-Story) (-)
Battery Energy Storage
Cook County
17031

⚡ Infrastructure

6fb54528-966c-4764-bda6-1e20dc045eb5
-
-
- kV
138kV at 1.5 mi (COMMONWEALTH EDISON CO)
633 ft
Not prime farmland
🔴 941 structures within 0.5 mi (setback/opposition risk)
Public

🌊 Environmental

Loading...
Loading...
N/A (non-MD)
None within ~3 miles
None within ~2 miles
None
None
1 site(s) within ~2 mi

💰 IRA/ITC Adders

No
Yes — Fossil Fuel Employment (FFE Area)
No

🏛️ Jurisdiction

Park Ridge
City
Park Ridge

📊 Assessment

/10

🤖 AI Site Assessment — Gemini Deep Research

1. Site Access & Topography

The subject property at 1480 Renaissance Drive benefits from excellent logistical access. Located within a developed commercial office park adjacent to the I-294 (Tri-State Tollway), the site is served by public, paved roads capable of handling heavy commercial traffic. This is a significant advantage for the delivery of oversized and overweight equipment, such as multi-ton transformers, switchgear, and containerized battery enclosures. A preliminary review of satellite imagery indicates no obvious vertical clearance issues (e.g., low bridges) or prohibitive turning radii on the immediate access routes.

Based on its location in the greater Chicago metropolitan area, the site's topography is presumed to be flat to gently sloping, which is ideal for BESS construction. This characteristic minimizes the need for extensive civil work and grading, thereby reducing site preparation costs and timelines. However, a formal topographical survey will be required to confirm precise elevations and plan for stormwater management. While road access to the parcel boundary is secure, a title search and ALTA survey are necessary to identify any existing utility or access easements crossing the property. Such easements could constrain the final site layout and must be incorporated into the design. The parcel size discrepancy between data sources (35.02 acres vs. 2.97 acres from Regrid) must be resolved immediately via a review of the plat map, as 2.97 acres is suitable for a distribution-scale project, while 35 acres suggests a potential subdivision or data error. We will proceed assuming the 2.97-acre size is more accurate for this specific APN.

2. Environmental Constraints

The environmental profile of this site presents several critical unknowns that must be addressed urgently. Both the FEMA Flood Zone and Wetlands status are listed as "Unknown." These represent potential fatal flaws. If the site is located within a 100-year floodplain (e.g., Zone AE) or a floodway, development costs would increase substantially due to the need for elevated equipment pads, or development could be prohibited entirely. Similarly, the presence of jurisdictional wetlands would trigger significant setback requirements (typically 50-100 feet) and a lengthy, expensive permitting process through the Army Corps of Engineers, potentially rendering the 2.97-acre parcel undevelopable.

On a positive note, the site shows no evidence of critical habitat, protected species, or proximity to sensitive protected areas. The risk of endangered species constraints is considered low. The property is not located in a designated brownfield, so it does not qualify for the 10% IRA brownfield tax credit adder. The presence of a superfund site within two miles warrants inclusion of potential soil and groundwater contamination in the scope of a Phase I Environmental Site Assessment (ESA), but it is primarily a diligence item rather than a direct risk to the subject parcel itself. Finally, the absence of any gas pipelines within a three-mile radius is a significant safety and design advantage, eliminating concerns related to pipeline setbacks and explosion risk.

3. Grid Infrastructure & Interconnection

Grid access is the most significant challenge

📸 Satellite Inspection

Satellite Close-up
Close-up (Zoom 17)
Satellite Wide
Context View (Zoom 14)
Terrain Map
Terrain / Roads

📝 Add Note

📋 Note History

No notes yet. Add the first note above.